PCR2005021
RESOLUTION #P.C.021-2005
APPROVAL OF A CONCEPTUAL AMENDED BUILDING SITE AND OPERATION PLAN
FOR MUSKEGO LAKES COUNTRY CLUB IN
THE SE ¼ OF SECTION 26 (TAX KEY NO. 2261.978.001/ STH 36)
WHEREAS, On January 21, 2005 plans were submitted by the Muskego Lakes
Corporation for an amendment to a Building, Site and Operation Plan for the Muskego
Lakes Country Club located in the SE ¼ of Section 26 (Tax Key No. 2261.978.001 / STH
36), and
WHEREAS, Said property is predominately zoned A, Agricultural District, and said use is a
permitted use by right subject to Building Site and Operation Plan approvals, and
WHEREAS, Petitioner proposes to add a storage facility across the parking lot from the
clubhouse along the portion of the property that abuts Stonebridge Subdivision, and
WHEREAS, Storage facilities currently exist on the northern portion of the property,
although these storage facilities will be razed in conjunction with the St. Andrew’s Village
Condominium development, and
WHEREAS, The new structure is proposed to be constructed out of steel siding and
roofing with colors of tans and browns, and
WHEREAS, The new structure will have white access doors and white overhead doors,
and
WHEREAS, The new structure is proposed to be screened by a landscaped berm from the
existing subdivision to the east, and
WHEREAS, The site contains an existing clubhouse that is made of brick siding and cedar
shake roofing.
THEREFORE BE IT RESOLVED, That the Plan Commission approves of a conceptual
amended Building, Site and Operation Plan for the Muskego Lakes Country Club located
in the SE ¼ of Section 26 (Tax Key No. 2261.978.001 / STH 36).
BE IT FURTHER RESOLVED, That the proposed storage facility, although principally
used for storage, must be constructed out of 50% masonry product that matches the
clubhouse to create a cohesive site that blends well with the surrounding land uses.
BE IT FURTHER RESOLVED, That the proposed storage facility shall utilize shingled
roofing material matching the colors of the clubhouse roofing.
BE IT FURTHER RESOLVED, That the Plan Commission will be receptive to screening of
the facility by a landscaped berm and the appropriation of masonry product to key areas
on the structure, however the facility is still subject to the requirements outlines above.
BE IT FURTHER RESOLVED, That a final Building Site and Operation Plan must have a
full site plan, building elevations, and landscape plan as part of the submittal.
BE IT FURTHER RESOLVED, That the final Building Site and Operation Plan must show
any wetlands that may exist in the area.
BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building
Department and that all aspect of this plan as they relate to drainage shall be maintained
in perpetuity unless otherwise authorized by the Plan Commission.
BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this
resolution shall result in the imposition of fines of $100 per day, the initiation of legal
action, or both.
BE IT FURTHER RESOLVED, That this approval is granted in concept only and final
action is only an indication of the current intent of the Plan Commission; Final submittals
are subject to future review and consideration by the Plan Commission, municipal
committees of jurisdiction, and other agencies, and approval of final plans is not
guaranteed by this action of the Plan Commission.
Plan Commission
City of Muskego
Adopted:
Defeated:
Deferred: February 15, 2005; March 1, 2005; March 15, 2005; April 19, 2005
Introduced: February 15, 2005
ATTEST: Sandi Asti, Recording Secretary