Loading...
PCR2004127RESOLUTION #P.C.127-2004 APPROVAL OF A BUILDING SITE AND OPERATION PLAN FOR BURBACK BUILDERS LLC IN THE NW ¼ OF SECTION 16 (TAX KEY NO. 2221.016.001 / W185 S8095 RACINE AVENUE) WHEREAS, On November 19, 2004 plans were submitted by Burback Builders LLC for an amendment to a Building, Site and Operation Plan for a property located in the Muskego Industrial Park located in the NW ¼ of Section 16 (Tax Key No. 2221.016.001 / W185 S8095 Racine Avenue), and WHEREAS, Said property is zoned I-1 Industrial Park District, and said use is a permitted use by right subject to Building Site and Operation Plan approvals, and WHEREAS, The site currently consists of two structures, one of which is 3,072 square feet used for office space and a 3,200 square-foot outbuilding for warehousing, and WHEREAS, The site currently has overgrown landscaping and overgrowth within the gravel access ways, and WHEREAS, The Petitioner proposes to alter the current site by adding a second floor with three new gables to the office building, adding a front doorway and more windows to the office building, while also updating landscaping, and parking arrangements on the site, and said proposal meets the bulk requirements of the Zoning Code, and WHEREAS, The Petitioner also is requesting preliminary approval of two new storage unit buildings consisting of a 4,000 square-foot unit in the northwest portion of the property and a 8,000 square-foot unit in the southwest portion of the property, and WHEREAS, Building materials and colors used on the newly updated office structure will include new weatherwood colored dimensional asphalt shingles, new almond colored casement windows, new beige colored Miratec corners and wraps, new taupe colored hardi-plank siding, and the existing stone belt line, and WHEREAS, The building does not meet the 50% masonry requirement for a commercial structure in the City’s General Design Guide, however the building is existing and will be extensively updated, and WHEREAS, Parking is illustrated as 5 parking stalls for public use and 5 stalls for employee use and the public stalls appear to be under the 10’x20’ requirement, and WHEREAS, 1 space of parking is needed for every 2 employees in an industrial use and the parking depicted allows for this plus additional spaces for customers, and WHEREAS, No additional lighting is shown on the new plans and any new lighting would need Plan Commission approval, and WHEREAS, No area is designated for refuse/recycling and Plan Commission approval would be needed if an enclosure is sought, and WHEREAS, A monument sign location is shown although no specific signage is proposed at this time and Plan Commission and/or staff approval may be needed when signage is requested, and WHEREAS, A landscape plan is depicted within the submittal and some updates are needed as per the City Forester, and WHEREAS, An existing chain link fence exists around the majority of the property and a new wood plank fence is to be located facing the Racine Avenue right-of-way on the northern portion of the office building and a decorative iron gate with an auto operated keypad is to be located on the south portion of the office building, and WHEREAS, Access is provided to the site with one entrance off of Racine Avenue that is a concrete surfaced drive and the current access is sufficient for the site, and WHEREAS, Stormwater management may need to occur and would have to be located on the property to be approved by the Engineering Department before work commences, and THEREFORE BE IT RESOLVED, That the Plan Commission approves of an amended Building, Site and Operation Plan for the Burback Builders LLC located in the NW ¼ of Section 16 (Tax Key No. 2221.016.001 / Racine Avenue). BE IT FURTHER RESOLVED, The approval is for the current site alterations and conceptual approval for the storage facilities. BE IT FURTHER RESOLVED, Final Plan Commission approvals will be required for the proposed storage facilities and the submittal must include a revised site plan, building elevations, and any other details that relate to the addition of the storage facilities at that time. BE IT FURTHER RESOLVED, The need for stormwater management for the current site will be determined by the Engineering Department at the time of building permits. BE IT FURTHER RESOLVED, That if a outdoor refuse facility is sought it will need to have locations and building elevations approved by the Planning Department and/or Plan Commission. BE IT FURTHER RESOLVED, That no mechanicals are shown to adorn the roof and if any are required they must be screened from view and colored to match the principal structure. BE IT FURTHER RESOLVED, That the landscape plan shall be enhanced according to the comments from the City Forester and submitted for approvals prior to the release of building permits. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspect of this plan as they relate to drainage shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: December 7, 2004 Defeated: Deferred: Introduced: December 7, 2004 ATTEST: Sandi Asti, Recording Secretary