Loading...
PCR2004115RESOLUTION #P.C.115-2004 APPROVAL OF AN AMENDMENT TO THE BUILDING SITE AND OPERATION PLAN FOR THE INPRO CORPORATION LOCATED IN THE NW ¼ OF SECTION 16 AND NE ¼ OF SECTION 17 (TAX KEY NOs. 2221.001, 2221.002, 2221.003, 2221.004 and 2221.006.001 / APOLLO DRIVE) WHEREAS, On September 29, 2004 plans were submitted by the Inpro Corporation for an amendment to a Building, Site and Operation Plan for the Inpro property and western bordering properties located in the NW ¼ of Section 16 and NE ¼ of Section 17 (Tax Key Nos. 2221.001, 2221.002, 2221.003, 2221.004 and 2221.006.001 / Apollo Drive), and WHEREAS, Said property is zoned I-1/OPD Industrial park District with a Planned Development Overlay District, and said use is a permitted use by right subject to Building Site and Operation Plan approvals, and WHEREAS, The OPD Planned Development Overlay District is specifically to allow a decreased setback to 25 feet for the new addition that is requested, and WHEREAS, Petitioner proposes to create a new 82,000 square-foot addition to the current structure that will house light manufacturing, office, and gathering space, and WHEREAS, The new addition will mimic the design of the existing structure while also updating lighting, landscaping, and parking arrangements on the site, and said proposal meets the bulk requirements of the Zoning Code, and WHEREAS, The new addition will require the razing and acquiring of existing properties and when complete will result in a one cohesive development, and WHEREAS, The site currently consists of gravel and cement drives and various structures that will be razed, and WHEREAS, Building materials used on the new structure will mimic the materials used on the existing structure consisting of split faced CMU, ribbed split CMU, tinted windows, and overhead doors, and colors will be of greys and blues matching the original structure, and WHEREAS, Parking is illustrated as 98 new parking stalls and the amount of parking is more than sufficient for the needed one stall per 2 employees for an industrial use, and WHEREAS, A photometric plan is provided depicting conformity to City standard of not more than 0.5 foot-candles at the surrounding property lines and no lighting will hinder any surrounding property, and WHEREAS, Lighting consists of 11 new zero degree cutoff exterior wall bracket lights that will be high-pressure sodium and have voltages of 277 and all lighting will be 15 feet in height or less from grade, and WHEREAS, One of the lights included in the design will be pole light that will not exceed 15 feet in height and will have a base of no more than 6 inches above grade, and WHEREAS, No specific signage is proposed at this time and Plan Commission and/or staff approval may be needed when signage is requested, and WHEREAS, A landscape plan is depicted within the submittal and some updates are needed as per the City Forester although the overall plan compliments the development, and WHEREAS, Access is provided to the site with one entrance off of Mercury Drive and two entrances off of Apollo Drive and a safety issue may exist with the westerly most Apollo Drive entrance, and WHEREAS, Stormwater management will not be needed as the Engineering Department has determined that this site will not be creating additional impervious surface. THEREFORE BE IT RESOLVED, That the Plan Commission approves of an amended Building, Site and Operation Plan for the Inpro Corporation located in the NW ¼ of Section 16 and the NE ¼ of Section 17 (Tax Key Nos. 2221.001, 2221.002, 2221.003, 2221.004 and 2221.006.001/ Apollo Drive). BE IT FURTHER RESOLVED, That the semi-trailers shall not enter from the west, the Apollo Drive entrance that is located closest to the intersection of Apollo Drive and Mercury Drive, so the safety of the this intersection is not hindered. BE IT FURTHER RESOLVED, That the property be incorporated into one tax-key prior to occupancy of the new structure so as not to create non-conformities on the property. BE IT FURTHER RESOLVED, That the light poles utilized on the property have a cement base of no more than 6 inches above grade. BE IT FURTHER RESOLVED, That no mechanicals are shown to adorn the roof and if any are required they must be screened from view and colored to match the principal structure. BE IT FURTHER RESOLVED, That the landscape plan shall be enhanced according to the comments from the City Forester and submitted for approvals prior to the release of building permits. BE IT FURTHER RESOLVED, That either lighting design proposed will work on the site as long as only one design is decided upon. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspect of this plan as they relate to drainage shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: October 19, 2004 Defeated: Deferred: Introduced: October 19, 2004 ATTEST: Sandi Asti, Recording Secretary