Loading...
PCR2004106RESOLUTION #P.C.106-2004 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AND A SUBSTANTIAL CHANGE TO THE APPROVED MUSKEGO CENTRE PLANNED DEVELOPMENT DISTRICT FOR MOUNTAIN MUDD ESPRESSO IN THE NE ¼ OF SECTION 17 (TAX KEY NO. 2192.970/ RACINE AVENUE) WHEREAS, On October 12, 2004 plans were submitted by Tony Gazzana for an a Building, Site and Operation Plan for Mountain Mudd Espresso located in the NE ¼ of Section 17 (Tax Key No. 2192.970 / Racine Avenue), and WHEREAS, Said property is zoned B-2/OPD Local Service Center District with a Planned Development Overlay District, and said use is a permitted use by right subject to Building Site and Operation Plan approvals, and WHEREAS, The OPD Planned Development Overlay District was previously approved and the addition of a new structure constitutes a substantial change to the district which may require enhancements to the underlying previously approved property, and WHEREAS, Petitioner proposes to alter the current site by adding a new 64 square-foot prefabricated structure along the east edge of the property along Racine Avenue, and WHEREAS, The new structure will be utilized as a single-lane drive-thru coffee shop that will have a maximum of two employees per shift, and WHEREAS, The site currently consists of a parking lot and has room to accommodate the proposed use with slight alterations and removal to some existing parking stalls, and WHEREAS, Building materials used on the new structure consist of thin brick that will match the brick color of the existing retail center and the roof structure will be made of a green Cooley-Brite material and this material does not match the materials used on the existing retail center, and WHEREAS, The building meets the 50% masonry requirement for a commercial structure in the City’s General Design Guide as all facades will utilize the thin mortared brick material that will match the existing retail center brick, and WHEREAS, Parking is currently sufficient for employees of the facility although enhancements to the lot itself are needed, and WHEREAS, No new lighting is shown on the plans although additional lighting may be needed, and WHEREAS, Refuse is to be picked up daily and handled off-site, and WHEREAS, Signage is shown to adorn the four sides of the roof measuring approximately 3.8 square feet per elevation this meets the zoning code allowance of 5% per elevation, and WHEREAS, A menu board will be attached on the east portion of the structure, and WHEREAS, The text of the signage will be white on the green background of the roof, and WHEREAS, A landscape plan is depicted within the submittal and some updates are needed as per the City Forester, and WHEREAS, The landscape plan depicts landscaping as four planters with shrubs and these may have to be changed to be shrubs within the ground, and WHEREAS, Access is provided to the site with one drive-thru entrance along the Racine Avenue right-of-way and continues with the same traffic pattern of the parking lot, although enhancements may be needed for the entrances and exits to the lane for added safety, and WHEREAS, Stormwater management is already accounted for on the site, although some drainage issues may exist. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site and Operation Plan and a substantial change to the approved Muskego Centre Planned Development District for Mountain Mudd Espresso located in the NE ¼ of Section 17 (Tax Key No. 2192.970 / Racine Avenue). BE IT FURTHER RESOLVED, That the site plan be shifted away from the Racine Avenue right-of-way to allow more room for serviced vehicles to turn back into the traffic lane at more of a ninety degree angle, as long as a 30-foot driving lane is maintained for the main parking lot it appears that this should be able to be accommodated. BE IT FURTHER RESOLVED, That the entrance to the drive-thru lane should be widened to at least 17 feet in width like the exit. BE IT FURTHER RESOLVED, That a landscape island abut the end of the exit lane instead of having a parking stall directly attached and this landscape berm should be reflected on the landscape plan submittal with the building permit application materials. BE IT FURTHER RESOLVED, That the parking lot be curbed along the backs of the existing parking stalls along Racine Avenue as none exists now and this will keep cars from driving into the drainage way. BE IT FURTHER RESOLVED, That the drive-thru lane be curbed along the Racine Avenue side of the lane as it currently does not at this time and this will keep cars from driving into the drainage way. BE IT FURTHER RESOLVED, That the retail center lot intended for Phase II of the Muskego Centre Development be restriped as the striping currently is almost non-existent and could be a safety hazard for the Mountain Mudd. BE IT FURTHER RESOLVED, That the petitioner must match the brick color to the existing retail center brick and the green roof must also match the green color of the existing retail structure. BE IT FURTHER RESOLVED, That the Engineering Department must review if additional stormwater drainage facilities will need to be added as it appears water drains to the Racine Avenue drainage channel where the new structure is proposed and this shall be done at the time of building permits. BE IT FURTHER RESOLVED, That Plan Commission finds that the addition of a new development and structure to an existing OPD constitutes a substantial change. BE IT FURTHER RESOLVED, That as part of the substantial change to the OPD, a cross- access easement and paving to the property line for a new driving lane must be established with the adjoining retail center property to the north as a cross-access easement currently exists and the Plan Commission is to promote cross-access whenever possible according to the City’s General Design Guide in order to promote safety and cohesiveness between developments. BE IT FURTHER RESOLVED, That light poles should be added along the drive-thru lane and near the exit to the drive-thru that matches the lighting fixtures for the rest of the site as there is no light in this area at night. BE IT FURTHER RESOLVED, That no mechanicals are shown to adorn the roof and if any are required they must be screened from view and colored to match the principal structure. BE IT FURTHER RESOLVED, That Public Utilities Committee will have to review to see if sewer and water hookups are necessary before the issuance of building permits. BE IT FURTHER RESOLVED, That the landscape plan shall be enhanced according to the comments from the City Forester and submitted for approvals prior to the release of building permits and that the landscape plan must show all plantings in the ground and no planters will be allowed. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspect of this plan as they relate to drainage shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: October 19, 2004 (4-2 Vote) Defeated: Deferred: Introduced: October 19, 2004 ATTEST: Sandi Asti, Recording Secretary