Loading...
PCR2004089RESOLUTION #P.C.089-2004 APPROVAL OF AN AMEDMENT TO A BUILDING SITE AND OPERATION PLAN FOR CALLEN CONSTRUCTION IN THE NE ¼ OF SECTION 1 (TAX KEY NO. 2161.994) WHEREAS, On July 27, 2004 plans were submitted by Bryan Tom for an amendment to a Building, Site and Operation Plan for Callen Construction located in the NE ¼ of Section 1 (Tax Key No. 2161.994 / Janesville Road), and WHEREAS, Said property is currently zoned RS-2/OOS Suburban Residence District with an Office and Special Service Overlay District, and said use is a permitted use by right subject to Building Site and Operation Plan approvals, and WHEREAS, Petitioner proposes to change the current building to add on more office space, a showroom, and an accessory structure, while also updating lighting, landscaping, and parking arrangements on the site, and said proposal meets the bulk requirements of the Zoning Code, and WHEREAS, An existing sign exists and no change in signage is part of the proposal, and WHEREAS, Building materials used on the updated structure consist of cultured fieldstone, dimensional shingles, vinyl siding, and pine trim boards, and WHEREAS, Skylights are used along the rooftop and decorative windows are used throughout, and WHEREAS, The building does not meet the 50% masonry requirement although it matches the materials used in the existing structure and improves upon them, and WHEREAS, Parking is illustrated as 22 parking stalls in total with the stalls at the front of the building for customer use only and are shown as 10’ x 20’ and the stalls at the rear of the building are for employee related parking only and the petitioner shows these stalls at 9’ x 20’, and WHEREAS, An accessory structure is proposed that mimics the building materials used on the principal structure and said accessory structure is screened from view of the right- of-way, and WHEREAS, Lighting consists of 19 exterior lights that appear to meet City requirements. Although no pole light elevations or photometric plans accompany the submittal, and WHEREAS, Landscaping is depicted within the submittal and meets City Forester approval, and WHEREAS, Access is provided throughout the site with one entrance off of Janesville Road and possible cross-access could be utilized by bordering properties if needed at a later time, and WHEREAS, Stormwater management will utilize the basin on the rear of the parcel and will be approved by the Engineering Department, and THEREFORE BE IT RESOLVED, That the Plan Commission approves of an amended Building, Site and Operation Plan for Callen Construction located in the NE ¼ of Section 1 (Tax Key No. 2161.994 / Janesville Road). BE IT FURTHER RESOLVED, That a photometric plan be provided to the Planning Department depicting conformity to City standards prior to approval of building permits. BE IT FURTHER RESOLVED, That the light poles utilized on the property have a cement base of no more than 6 inches above grade and the fixtures be zero-degree cutoff. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspect of this plan as they relate to drainage shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That a landscape plan shall be approved by the City Forester prior to the release of building permits. BE IT FURTHER RESOLVED, That the parking stalls illustrated in the proposal are smaller than standard and that this may be allowed as long as these stalls are kept as employee only. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: August 17, 2004 Defeated: Deferred: Introduced: August 17, 2004 ATTEST: Sandi Asti, Recording Secretary