PCR2004068RESOLUTION #P.C.068-2004 APPROVAL OF A BUILDING SITE AND OPERATION PLAN FOR OFFICE AND WAREHOUSE FACILITIES IN THE MUSKEGO INDUSTRIAL PARK LOCATED IN THE SE ¼ OF SECTION 17 (APOLLO DRIVE/ TAX KEY NOs. 2228.999.020 AND 2228.999.021) WHEREAS, On May 4, 2004 plans were submitted by Earl Meinen for a Building, Site and Operation Plan for warehouse and office facilities in the Muskego Industrial Park located in the SE ¼ of Section 17, and WHEREAS, Said property is currently zoned I-1 Industrial Park District, and said uses are permitted uses in said district, and WHEREAS, Said parcels will be serviced by public sewer and water facilities, and WHEREAS, Said property is subject to the design standards outlined in the City of Muskego’s General Design Guide and the Rules and Regulations for the Muskego Business/Industrial Park, and WHEREAS, The petitioner requests approval for a 11,448 square foot structure housing an office and a warehouse that will be constructed in two phases, and a 9,000 square foot RV storage building, and said structures meet the floor area and height requirements of the zoning ordinance, and WHEREAS, Proposal exists on two separate parcels with new structures proposed to utilize the same access point as the existing building, and easements or the merging of parcels may be required, and WHEREAS, Said structures are proposed to be constructed with industrial architectural influences, and are proposed to be constructed with exterior materials which include poured colored concrete walls with modular brick patterns, ribbed aluminum panels, aluminum fascia band, and colorkad roofing, and WHEREAS, Said structures depict the use of aluminum siding and colorkad roofing, and said materials and colors of materials mimic previous Plan Commission approvals, and WHEREAS, A truck well is proposed on the east half of the warehouse/office building and during loading times access concerns will be of no concern due to secondary thru- access around the east half of the property, and WHEREAS, Bollards are proposed within the truck well and no elevations are shown, and WHEREAS, All Building mechanicals, including HVAC units, are not shown but should be screened from view, and WHEREAS, A large area of pavement is shown for the appropriate ingress/egress for the RV storage, and WHEREAS, Stormwater and Grading Plans accompany the submittal and will require approvals of the Engineering Department before the release of building permits, and WHEREAS, Stormwater detention is proposed in an appropriate location behind the existing structure outside of delineated wetlands, and WHEREAS, Fencing is depicted along the western border of the property and the fencing is to be an “Owner’s Option,” and this fencing does not appear to be needed in conjunction with the landscaping, and WHEREAS, Fencing is depicted to be used on an as need basis for the RV storage facility and leaves this determination up to Plan Commission, and WHEREAS, Nine (9) parking stalls are proposed, and said number of parking stalls conforms to zoning requirements, and the stall size is indicated to be 10’ x 20’, and WHEREAS, One (1) monument sign is proposed for the site measuring 24 square feet in sign area, five feet in height, with a five-foot setback from the Apollo right-of-way, and advertising three users, and the proposed signage meets the Code requirements as outlined in Section 17:6.09 of the Municipal Code, and WHEREAS, Lighting for the buildings and site is proposed in the form of sixteen (16) fixtures, with lamps being 250-watt high pressure sodium to 70-watt high pressure sodium, and the photometric plans have been provided, and said plans have been found to meet the City requirements, and WHEREAS, A landscaping plan has been submitted, and the plans have been reviewed by the Conservation Forester, and said plans have been found to meet the City requirements, and WHEREAS, A dumpster enclosure exists on the site and was approved along with the existing building by Plan Commission in 1996, and elevations of new dumpster enclosures are included in the submittal in the event a new enclosure is needed for a tenant, and said new enclosure meets City requirements encompassing a cedar door with embossed concrete walls to match existing buildings proposed, and THEREFORE BE IT RESOLVED, That the Plan Commission approves of the Building, Site and Operation Plan submitted May 4, 2004 by Earl Meinen for warehouse and office facilities in the Muskego Industrial Park located in the SE ¼ of Section 17. BE IT FURTHER RESOLVED, That the Plan Commission finds the proposed architecture to conform to requirements outlined in the General Design Guide. BE IT FURTHER RESOLVED, That prior to the issuance of building permits, petitioner shall secure all cross-access easements/stormwater easements if the parcels are to remain as two separate properties OR the merging of the two parcels shall be accomplished and evidence of either of these scenarios must be presented to the Planning Department. BE IT FURTHER RESOLVED, That fencing will not be needed on the western border of the property or for extra security of the RV storage due to the proposed landscaping being sufficient and the industrial nature of the site. BE IT FURTHER RESOLVED, That bollards must be painted a natural color that matches the proposed structures. BE IT FURTHER RESOLVED, That all outdoor storage must be screened and stored and that all employee parking must utilize the approved parking locations. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspect of this plan as they relate to landscape areas and drainage shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That if occupancy is requested prior to the completion of landscaping and/or asphalting, a bond, or cashiers check equal to twice the value of said costs must be submitted to the Planning Department. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: Defeated: Deferred: June 1, 2004 Introduced: June 1, 2004 ATTEST: Sandi Asti, Recording Secretary