PCR2003017RESOLUTION #P.C. 017a-2003 APPROVAL OF A BUILDING SITE AND OPERATION PLAN FOR THE EDGEWOOD SUBSTATION LOCATED IN THE SE ¼ OF SECTION 13, T5N R19E (PART OF TAX KEY NO. 2230.999 / JANESVILLE ROAD). WHEREAS, Plans dated February 6, 2003 were submitted by WE Energies for a Building, Site and Operation Plan for a utility substation located in the SE ¼ of Section 13, T5N, R19E, and WHEREAS, Said Plan was revised and resubmitted on April 3, 2003 to address concerns of the Plan Commission, and WHEREAS, Said property is currently zoned I-2 General Industrial District and public utility offices and installations are permitted by right subject to Plan Commission approval of Building Site and Operation Plans, and subject to other plan and permit approvals from other agencies of jurisdiction, and WHEREAS, The adopted 2010 Comprehensive Plan indicates the area should be used for industrial land use, and the proposal is consistent with the Plan, and WHEREAS, The proposed use does not require sanitary sewer or water facilities, and WHEREAS, The proposal will require a land division in accordance with Chapter 18 of the Municipal Code, and the land division is proposed in Resolution # PC 016-2003, and said approvals have been received, and WHEREAS, The property does not abut a public way, and access is provided through adjacent lands owned by the petitioner, and WHEREAS, A gravel access drive to the site is proposed, and the General Design Guide requires pavement to promote dustless conditions, and WHEREAS, A landscape plan has been submitted, and the City Forester has reviewed the plan and requires a significant number of plan revisionsapproves of the revised plan dated April 3, 2003, and WHEREAS, Lighting on the site will be attached to the support structures and utilized for construction and maintenance purposes only, and WHEREAS, The site drains into the Fox River watershed, and is not included in the Comprehensive Stormwater Management Plan, and WHEREAS, The proposal is required to comply with Chapter 34 of the Municipal Code, and stormwater management initiatives are illustrated on the site plan, and THEREFORE BE IT RESOLVED, That the Plan Commission approves the amended Building, Site and Operation Plan submitted by WE Energies on April 3, 2003 for a parcel of land located in the SE ¼ of Section 13, T5N R19E (Part of Tax Key No. 2230.999 / Janesville Road). BE IT FURTHER RESOLVED, Revised That a stormwater management plans drainage easement shall be submitted for review and approval by the City Engineer prior to release of any permit for this Building Site and Operation Plan. BE IT FURTHER RESOLVED, That the access drive shall be installed in asphalt for a minimum distatnce of 50 feet, as measured from the edge of pavement of Janesville Road, and this shall be illustrated on the the final BSO Plan submitted for local permitting. BE IT FURTHER RESOLVED, That a revised landscape plan shall be submitted to address the City Forester’s concerns. Plan Commission City of Muskego Adopted: April 15, 2003 Defeated: Deferred: February 18, 2003; March 4, 2003; April 1, 2003 Introduced: February 18, 2003 ATTEST: Sandra S. Asti, Recording Secretary