PCR2001138e RESOLUTION #P.C. 138-2001 APPROVAL OF AN AMENDMENT TO A BUILDING, SITE AND OPERATION PLAN FOR THE ST LEONARD CONGREGATION PROPERTY LOCATED AT W173 S7743 WESTWOOD DRIVE (TAX KEY NO. 2196.945) WHEREAS, On August 23, 2001 conceptual plans were submitted by Birschbach & Associates to amend the existing building, site and operation plan of the St Leonard Congregation property located at W173 S7743 Westwood Drive. and WHEREAS, The existing property contains a church, private elementary school, and ancillary uses, and WHEREAS, The petitioner proposes to construct a 10,315 square foot addition to the church, a covered entryway, and an 11,875 square foot gymnasium, and WHEREAS, The property is zoned RS-3 / OIP District and the existing and proposed uses are in conformance to all the requirements of said zoning district, and WHEREAS, The proposed structures meet the setback, offset, and floor area requirements of the zoning district, but the proposed steeple exceeds the height requirements of the district by 42 feet, and e WHEREAS, The site presently includes 339 parking spaces and the proposal requires a minimum of 65 additional parking stalls, and WHEREAS, Landscaping, photometric, and stormwater management plans have not been provided, and WHEREAS, The 10,315 square foot addition to the church is proposed to be constructed of face brick and cedar to match the existing structure, and WHEREAS, The 11, 875 square foot addition to the school is proposed to be constructed of precast concrete panels, and said materials are not consistent with the balance of the site. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a conceptual amended building, site and operation plan for the construction of a 10,315 square foot addition to the church, a covered entryway. and an 11.875 square foot gymnasium at the St Leonard Congregation property located at W 173 S7743 Westwood Drive. e e BE IT FURTHER RESOLVED, that the final Building Site and Operation Plan submittals shall include the addition of a minimum of 65 parking stalls, shall include detailed landscaping plans, photometric plans, and stormwater management plans. BE IT FURTHER RESOLVED, that the final Building Site and Operation Plan submittals shall include revised building materials for the 11,875 square foot gymnasium to match the balance of the structure. BE IT FURTHER RESOLVED, That concurrent with the final Building Site and Operation Plan review, pursuant to Section 175.03 of the Zoning Code, the Plan Commission will be receptive to the issuance of a height exception for the steeple. BE IT FURTHER RESOLVED, that this approval is granted in concept only and final action is only an indication of the current intent of the Plan Commission; Final submittals are subject to future review and consideration by the Plan Commission, municipal committees of jurisdiction, and other agencies, and approval of final plans is not guaranteed by this action of the Plan Commission. Plan Commission City of Muskego Adopted: September 18, 2001 Defeated: Deferred: September 4,2001 Introduced: September 4, 2001 ATTEST. Sandi Asti, Recording Secretary d”d&