Loading...
PCR2001004a AMENDED APPROVAL OF A BUILDING, SITE AND OPERATION PLAN AND CONDITIONAL USE GRANT FOR KINGDOM CARE DAY CHILD CARE CENTER LOCATED IN THE SE % OF SECTION 9 (TAX KEY NO. 21 93.125 / S75 W17510 JANESVILLE ROAD) RESOLUTION #PC 004-2001 WHEREAS, Plans were submitted by Mike and Diane Kostecki for a Building, Site and Operation plan and Conditional Use Grant for the Kingdom Care Child Care located at S75 W17510 Janesville Road on January 14,2000, and WHEREAS, The property is zoned B-WOED Highway Business District as modified by the Existing Development Overlay District, and the Plan Commission has determined that the proposed use is permitted by Conditional Use Grant, and WHEREAS, The property contains an existing 800 square foot structure to be refurbished to accommodate the day care center, and WHEREAS, Interior alterations must be in conformance with all State and Federal Code and licensing requirements, and WHEREAS, A maximum of 16 children of ages 6 weeks to 24 months are proposed to be accommodated on site, and are proposed to be served by up to four adult employees, and WHEREAS, No outdoor lighting or landscaping changes are proposed, and the existing signage may be refaced, and WHEREAS, A no change to the existing parking lot is proposed, and, WHEREAS, All required State and Federal licenses must be obtained prior to occupancy, and THEREFORE BE IT RESOLVED, That the Plan Commission approves of a building, site and operation plan and conditional use grant for the Kingdom Care Child Center located at S75 W17510 Janesville Road. BE IT FURTHER RESOLVED, The Plan Commission shall evaluate the adequacy of the existing parking area one (1) year after occupancy, and may place additional requirements on the petitioner at that time. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspect of this plan as they relate to landscape areas building facades and drainage shall be maintained in perpetuity unless otherwise authorized by 0 the Plan Commission. BE IT FURTHER RESOLVED, If petitioner does not commence construction activity or otherwise begin operation pursuant to this Conditional Use grant within 24 months of the date of approval the Conditional Use Grant shall expire and this approval shall be null and void. BE IT FURTHER RESOLVED, Where uses authorized by this Conditional Use Grant are discontinued for a period of twelve (12) consecutive months or are discontinued for eighteen (18) cumulative months in any three (3) year period, the Conditional Use Grant shall expire and this approval shall be null and void, BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. THEREFORE BE IT FURTHER RESOLVED, That an annual review for the parking and signage should occur one year after occupancy. Plan Commission City of Muskego 0 Adopted: January 16,2001 Defeated: Deferred: Introduced: January 16, 2001 ATTEST. Sandi Asti, Recording Secretary )4& J LLz!L