PCR2000145ADOPTED
RESOLUTION #P.C. 145-2000
APPROVAL OF A FOUR (4) LOT SKETCH LAND DIVISION FOR THE DE BACK
PROPERTY LOCATED IN THE SW % OF SECTION 32
(PART OF TAX KEY NO. 2287.998.004 I MUSKEG0 DAM DRIVE)
WHEREAS, On July 6, 2000 a sketch was submitted by Harold DeBack for a four (4) lot
sketch land division of the DeBack property located in the SW X of Section 32, (Part of
Tax Key No. 2287.998.004), and
WHEREAS, The proposed land division would create two residential lots with a
minimum area of approximately four acres and an average minimum width of 220 feet,
and two outlots which can not support on-site sanitary systems under current rules and
regulations, and
WHEREAS, Said property is zoned Rs-2 - Suburban Residence District, requiring a un-
sewered parcels to have a minimum lot size of 40,000 square feet and an average
minimum width of 220 feet, and parcels meet said minimum zoning requirements, and
WHEREAS, The 2005 Comprehensive Plan depicts this area as being set aside for
medium density residential development and this proposal is within this goal, and 0 WHEREAS, The 2010 Comprehensive Plan depicts this area as being set aside for
medium density residential development and this proposal is within this goal, and
WHEREAS, Said parcels will be serviced by private sewer and water facilities.
THEREFORE BE IT RESOLVED, That the Plan Commission approve of a sketch
Certified Survey Map being submitted creating a four (4) lot land division of the DeBack
property in the SW % of Section 32.
BE IT FURTHER RESOLVED, That the proposed properties are only to be platted to
the meander line.
BE IT FURTHER RESOLVED, That the lake shall become a public body of water for
which public access must be provided on the Final CSM.
BE IT FURTHER RESOLVED, The City Engineer has requested in determination of
navigability for the drainage way from the Wisconsin Department of Natural Resources.
BE IT FURTHER RESOLVED, That this approval is granted in concept only and final
action is only an indication of the current intent of the Plan Commission; Final
submittals are subject to future review and consideration by the Plan Commission,
municipal committees of jurisdiction, and other agencies, and approval of final plans is
I. not guaranteed by this action of the Plan Commission.
BE IT FURTHER RESOLVED, That all wetlands are required to be delineated on the
Final Certified Survey Map.
THEREFORE BE IT FURTHER RESOLVED, That deed restrictions be placed on
parcels to prohibit future re-division of the parcels.
Plan Commission
City of Muskego
Adopted: July 18, 2000
Defeated:
Deferred:
Introduced: July 18, 2000
ATTEST. Sandi Asti, Recording Secretary d& J. L2d.L.