PCR20000430 AMENDED
APPROVAL OF A FOUR (4) LOT SKETCH LAND DIVISION FOR THE DE BACK
PROPERTY LOCATED IN THE SW %OF SECTION 32
(PART OF TAX KEY NO. 2287.998.004 I MUSKEG0 DAM DRIVE)
RESOLUTION #P.C. 043-2000
WHEREAS, On February 21, 2000 a sketch was submitted by Harold DeBack
for a four (4) lot sketch land division of the DeBack property located in the SW X of
Section 32, (Part of Tax Key No. 2287.998.004), and
WHEREAS, The proposed land division would create lots with a minimum area
of approximately nine acres and an average minimum width of 31 0 feet. and
WHEREAS, Said property is zoned Rs-2 - Suburban Residence District.
requiring a minimum lot Size of 20,000 square feet and an average minimum width of
110 feet, and parcels meet said minimum zoning requirements for lot width and square
footage, and
WHEREAS, Said Land divisions will result in a 1.9 acre remnant parcel which
does meet the standards of the Rs-2 District, and
e WHEREAS, The Land Use 2005 Plan depicts this area as being set aside for
medium density residential development and this proposal is within this goal, and
WHEREAS, Said parcels will be serviced by private sewer and water facilities,
and
THEREFORE BE IT RESOLVED, That the Plan Commission approve of a
sketch Certified Survey Map being submitted creating a four (4) lot land division of the
DeBack property in the SW X of Section 32.
BE IT FURTHER RESOLVED, That the 1.9 acre remnant parcel may be
excluded from the Certified Survey Map.
BE IT FURTHER RESOLVED, That the proposed properties are only to be
platted to the meander line.
BE IT FURTHER RESOLVED, That the lake shall become a public body of water
for which public access must be provided on the Final CSM.
BE IT FURTHER RESOLVED, The City Engineer has requested in
determination of navigability for the drainage way from the Wisconsin Department of
Natural Resources.
BE IT FURTHER RESOLVED, That this approval is granted in concept only and
final action is only an indication of the current intent of the Plan Commission; Final
submittals are subject to future review and consideration by the Plan Commission,
municipal committees of jurisdiction, and other agencies, and approval of final plans is
not guaranteed by this action of the Plan Commission.
BE IT FURTHER RESOLVED, That all wetlands are required to be delineated
on the Final Certified Survey Map.
THEREFORE BE IT FURTHER RESOLVED, That deed restrictions be placed
on parcels to prohibit future re-division of the parcels.
Adopted:
Defeated:
Deferred:
Introduced:
ATTEST.
Plan Commission
City of Muskego
03-07-00
March 7, 2000
&Asti, Recording Secretary
Ai J LAA,
Page 2