Loading...
PCR1998186AMENDED ***(3-16-99) AMENDED**(3-2-99) AMENDED* (11-17-98) RESOLUTION #P.C. 186-98 0 APPROVAL OF A CONCPEPTUAL SITE AND OPERATION PLAN FOR AN EXTRACTIVE PERMIT FOR SUPERIOR EMERALD PARK LANDFILL AT THE PROPERTY LOCATED AT W 124 S 10629 124 STREET WHEREAS, Conceptual plans were submitted on October 12, 1998 by Superior Emerald Park for an Extractive Permit at W124 SI0629 124 Street (US. HWY 45) and WHEREAS, Said property is currently zoned 1-2 General Industrial and A Agricultural, and the proposed use is a permitted use by conditional grant in both districts, and WHEREAS, The proposed extractive operation would be as follows: activity from 7:OO a.m. and close down at 4:30 p.m. on weekdays *with no Saturday, Sunday or Holiday operation; there will be up to 10 trucks canying, on average, 20 tons of material at two loads per hour for a total of up to 190 trips in a 9 1/2 hour day; the removal of an estimated ***377,000 cubic yards of clay, and WHEREAS, The extractive operation would begin approximately 560 feet west of U.S. HWY 45, extend hrther west approximately another 650 feet, have a north-south dimension of approximately 920 feet, and result in a *25 foot deep pit being approximately **22 feet below the elevation ofU.S. HWY 45, and a WHEREAS. The intent is to utilize the pit to create a pond area if a currently proposed landfill expansion for the same location is not permitted by approving authorities. THEREFORE BE IT RESOLVED. That the Plan Commission approves of the conceptual site and operation plans dated """March 5, 1999 by Superior Emerald park for an extractive permit at the Superior Emerald Park property located at W124 S10629 124 Street (US. HWY 45). BE IT FURTHER RESOLVED, That a conditional use public hearing is scheduled for November 17, 1998 as part of the formal extractive permit process, and approval by the Plan Commission of the conditional use permit for the extractive operation is required prior to the commencement of the extractive operations. "*THEREFORE BE IT FURTHER RESOLVED, That approval is contingent upon interim construction agreement being approved by Siting Committee and Common Council. That the road surfaces to maintain a dirt-free and dust-free environment within one hour of the presence of said condition. Plan Commission approves Restoration Plan Alternative A **"with a Restoration Bond in the amount of S32.180.70. Plan Commission 0 City of Muskego Approved 03-02-99 03-16-99 I Denied e Deferred 1 1-3-98 11-17-98 12-1-98 12- 15-98 0 1 -05-99 0 I - 1 9-99 02-02-99 02-16-99 03-09-99 * Page 2