Loading...
PCR1997234AMENDED APPROVAL OF AN AMENDMENT TO CERTIFIED SURVEY MAP CREATING A LOCATED IN THE SE % SECTION 5 RESOLUTION #P.C. 234-97 TWO (2) LOT LAND DIVISION FOR VID-COM ENGINEERING AT THE PROPERTY WHEREAS, The Plan Commission approved of a Certified Survey Map for a two (2) Lot land division in the SE 114 of Section 5 for Vid-Corn Engineering, Inc., under Resolution #PC. 120-97, on June 3, 1997, and WHEREAS, A condition of approval was that a 60 foot diameter temporary cul-de-sac at the end of Adrian Drive be approved by the Public Works Committee and constructed prior to the issuance of any occupancy permits for Parcels 1 and 2 of this CSM, and WHEREAS, The petitioner is requesting to amend the conditions of approval to allow for the issuance of occupancy for the residence built on Parcel 1 and that the temporary cul-de-sac be installed in spring. THEREFORE BE IT RESOLVED, That the Plan Commission approve of an amendment to Resolution #P.C. 120-97, to allow for the issuance ofoccupancy for the residence being built on Parcel 1, prior to the completion of a temporary cul-de-sac. THEREFORE BE IT RESOLVED, That occupancy will be allowed prior to construction of the temporary cul-de-sac subject to a cash deposit in the amount of construction be deposited with the City. Cash amount will be determined by City Staff and City Engineers with approval by Public Works. Plan Department City of Muskego Adopted 12-02-97 Defeated Deferred 1 1-24-97