Loading...
PCR1997052AMENDED APPROVAL OF A BUILDING, SITE AND OPERATION PLAN FOR A WAREHOUSE SUBMITTED BY HIRAM P. MILLER, JR., FOR THE PROPERTY RESOLUTION #P.C. 52-97 LOCATED AT S84 W18693 ENTERPRISE DRIVE WHEREAS, Plans for a new warehouse facility in the Muskego Industrial Park were submitted on March 5, 1997, by Hiram P. Miller, Jr., for Miller Enterprises to be located at S84 W18693 Enterprise Drive, and WHEREAS, The plans show a 15,404 square foot structure with 2,560 square feet of warehouse space and 2,844 square feet of office space, and accented with scored and ground face block, a semi-circle entry along Enterprise Drive with a galvanized corrugated roof cover arched over the entry way, and WHEREAS, The elevations show a split face block structure WHEREAS, The site plan shows a well landscaped front with a ground sign centered on the building along Enterprise Drive, spotted trees along the rear of the property, no trees along the east and west sides, parking along the front and east sides, and a slatted fenced outdoor storage area south of the - a building, and - WHEREAS, The Plan Commission had approved a previous submittal for a Building, Site and Operation Plan for this site and for a John Davis under Resolution #P.C. 97-95 on June 20, 1995, WHEREAS, The new plans submitted represent a substantial change and improvement from the previous plans. THEREFORE BE IT RESOLVED, That the Plan Commission approve the Building, Site and Operation Plan for Miller Enterprises located at S84 W18693 Enterprise Drive. BE IT FURTHER RESOLVED, That occupancy is requested prior to the completion of landscaping, a bond, letter of credit or cashiers check equal to twice the value of said costs must be submitted to the Planning Department along with an itemized price list of said costs from a qualified dealer. BE IT FURTHER RESOLVED, That all aspects of this plan as they relate to landscaped areas and drainage shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the conditions of this approval shall result in the imposition of action, or both. * I fines of $100 per day per violation, the initiation of legal BE IT FURTHER RESOLVED, That lighting will consist of sodium vapor, cut-off, down cast fixtures. Pole lighting height allowed up to 15 foot maximum. Landscaping plan to be submitted and reviewed by Staff. Plan Commission City of Muskego Adopted 03-18-97 Defeated Deferred 03-11-97