PCR1994161AMENDED
RESOLUTION #P.C. 161-94
APPROVAL OF CERTIFIED SURVEY MAP FOR LAND DIVISION
FOR ONE LOT FOR FIRSTAR BANK LOCATED
(SE CORNER OF JANESVILLE ROAD & LANNON DRIVE)
IN THE SW 1/4 OF SECTION 10
WHEREAS, A Certified Survey was submitted showing the
correct road dedication as required by the approval of the
Building, Site and Operation for this site, and
additional lands necessary to the City and County for road
dedication, and
WHEREAS, This is an existing lot that has dedicated the
WHEREAS, The size of the lot will be 1.5820 acres, and
WHEREAS, This land is zoned B-2 Zoning District and said lot
appears to meet the requirements of district, and
and the future home a newly constructed Firstar Bank, and
WHEREAS, The lot is the existing site of the Firstar Bank
WHEREAS, Access is available from Lannon Drive, and
WHEREAS, The sketch was approved through the amended 0 Building, Site an Operation Plan.
THEREFORE BE IT RESOLVED, That the Plan Commission approves
the Certified Survey Map being submitted depicting additional
right-of-way dedication along Janesville Road in the SW 1/4 of
Section 10 for the Firstar Bank site subject to the resolution
of technical discrepancies as identified by the City Engineer
and payment of all applicable fees as identified in Section 10
of the Land Division Ordinance.
City of Muskego
Plan Commission
Adopted 08-02-94
Defeated
Deferred
07-27-94