PCR1994067RESOLUTION 67-94 AMENDED APPROVAL OF AMENDED BUILDING, SITE AND OPERATION PLAN BY MICHAEL A. HAESSLY FOR ST. FRANCIS BANK LOCATED AT S74 W17100 JANESVILLE ROAD WHEREAS, Michael A. Haessly submitted, on March 23, 1994, an amended Building, Site, and Operation plan to allow the expansion of existing drive-through facilities at St Francis Bank on Janesville Road, and WHEREAS, The expansion of said facilities will result in the substantial loss of trees and shrubs, and WHEREAS, There currently exist traffic congestion problems on Lannon Drive which are partially attributable to customer traffic associated with St. Francis Bank and the mall common access drive, and WHEREAS, A site plan has been submitted which serves to address/minimize the above described site deficiencies. THEREFORE BE IT RESOLVED, That the Plan Commission approve the amended Building, Site, and Operation Plan subject to implementation of on-site and off-site improvements as identified on the site plan received March 23, 1994, and BE IT FURTHER RESOLVED, That all on-site and off-site improvements (i.e. landscaping, median work, catch basin installation, grading, driveway modifications, access drive widening, traffic circulation signage, etc.) be installed by St. Francis Bank prior to final inspection for occupancy/operation of the canopy addition, and BE IT FURTHER RESOLVED, That any catch basin work within the right-of-way of Lannon Drive is subject to the review and within Lannon Drive right-of-way are subject to Public Safety approval of the City Engineer and Public Works Committee. Signs Committee approval. point will be clearly marked as a dedicated right hand turn only and left hand turn only and the addition of a STOP sign just north of the old ATM. BE IT FURTHER RESOLVED, That the furthermost southern exit Plan Commission City of Muskego Adopted 04-05-94 Defeated Deferred RESOLUTION 67-94 APPROVAL OF AMENDED BUILDING, SITE AND OPERATION PLAN BY MICHAEL A. HAESSLY FOR ST. FRANCIS BANK LOCATED AT 574 W17100 JANESVILLE ROAD amended Building, Site, and Operation plan to allow the expansion of existing drive-through facilities at St Francis Bank on Janesville Road, and WHEREAS, Michael A. Haessly submitted, on March 23, 1994, an substantial loss of trees and shrubs, and WHEREAS, The expansion of said facilities will result in the on Lannon Drive which are partially attributable to customer traffic associated with St. Francis Bank and the mall common access drive, and WHEREAS, There currently exist traffic congestion problems address/minimize the above described site deficiencies. WHEREAS, A site plan has been submitted which serves to THEREFORE BE IT RESOLVED, That the Plan Commission approve the amended Building, Site, and Operation Plan subject to implementation of on-site and off-site improvements as identified on the site plan received March 23, 1994, and improvements (i.e. landscaping, median work, catch basin widening, traffic circulation signage, etc.) be installed by St. installation, grading, driveway modifications, access drive Francis Bank prior to final inspection for occupancy/operation of the canopy addition, and BE IT FURTHER RESOLVED, That all on-site and off-site BE IT FURTHER RESOLVED, That any catch basin work within the right-of-way of Lannon Drive is subject to the review and approval of the City Engineer and Public Works Committee. Signs within Lannon Drive right-of-way are subject to Public Safety Committee approval. Plan Commission City of Muskego Adopted Defeated Deferred 03-29-94