Loading...
PCR1993219AMENDED APPROVAL OF AMENDED BUILDING, SITE AND OPERATION PLAN FOR LLOYD HA" LOCATED AT 580 W18753 APOLLO DRIVE WHEREAS, Contour Tool & Stamping, representing Lloyd Ham, RESOLUTION 219-93 Operation plan to allow for the installation of a dock level submitted, on November 24, 1993, an amended Building, Site, and loading dock, and WHEREAS, The Plan Commission on August 6, 1976, adopted a Building, Site and Operation plan through Resolution #P.C. 89-76 and amended that Building, Site and Operation plan through Resolution #P.C. 142-86, by approving another building, and amended that Building, Site and Operation plan through Resolution #P.C. 85-90, by approving above ground gasoline tank, and the amended Building, Site, and Operation plan for Lloyd Hamm THEREFORE BE IT RESOLVED, That the Plan Commission approve to allow for the installation of a dock level loading dock (as depicted on the plans dated received November 24, 1993) located at S80 W18753 Apollo Drive. BE IT FURTHER RESOLVED, That the site plan submitted November 24, 1993 shall be revised to illustrate the result of earth removal. Said revision shall be submitted for installation of landscaping along the areas to be sloped as a Landscaping shall be installed within 30 days of the completion Staff review prior to the issuance of a building permit. weather permits. of construction of subject dock level loading dock or as 0 November 24, 1993) exhibits and revisions are to be kept on file at the City of Muskego. BE IT FURTHER RESOLVED, That the site plan (Dated received City of Muskego Plan Commission Adopted 12-07-93 Defeated Deferred 11-29-93