Loading...
PCR1993187RESOLUTION 187-93 AMERITECH MOBILE COMMUNICATIONS FOR MUSKEGO HIGH SCHOOL APPROVAL OF BUILDING, SITE AND OPERATION PLAN BY WHEREAS, Ameritech Mobile Communications submitted, on September 10, 1993, an amended Building, Site, and Operation plan to allow a 150' monopole with an additional 4' deck box/concession stand/storage area 18' x 28' x 30' high which structure for a total height of 154' and a new press will house the cellular radio equipment to be added to the existing high school building located on the corner of Woods Road and Racine Avenue, and WHEREAS, The proposed monopole consist of a 150' tubular steel column tapering from approximately 34" at the base to 17" at the top where at a triangular platform structure is mounted, and facility and will be visited on the average of once or twice a WHEREAS, The Cellular telephone facility is an unmanned month by maintenance personnel, and Road by an 8' wide utility easement, and WHEREAS, Access to the property will be provided from Woods THEREFORE BE IT RESOLVED, That the Plan Commission approve High School the amended Building, Site, and Operation plan for the Muskego BE IT FURTHER RESOLVED, That the site plan (Dated received September 10, 1993) is to be kept on file at the City of Muskego. Plan Commission City of Muskego Adopted 09-21-93 Defeated Deferred 09-15-93