Loading...
PCR1993156AMENDED APPROVAL OF CERTIFIED SURVEY MAP OF THREE (3) PARCELS IN THE SE 1/4 OF SECTION 8 AND THE SW 1/4 OF SECTION 9 BY METROPOLITAN ENGINEERING WHEREAS, A Certified Survey Map was submitted on July 23, 1993, by Metropolitan Engineering for a three (3) lot land division in the SE 1/4 of Section 8 and the SW 1/4 of Section 9, and RESOLUTION # P.C. 156-93 WHEREAS, The Plan Commission on July 6, 1993 approved a Sketch for a three (3) parcel land division through Resolution two feet above the FEMA line being depicted on the Certified #P.C. 140-93 subject to the FEMA 100 year flood line and the by DNR. Survey Map, along with the Ordinary High Water Mark as approved WHEREAS, This land is presently zoned RS-3/0ED/OLS which requires a minimum lot size of 9,900 square feet and a minimum average width of 66 feet and the parcels meet the lot size and width requirements of the Zoning District, and WHEREAS, Sanitary sewer and access to the properties is available from Lions Park Drive, and WHEREAS, An additional maintenance easement is needed to access the silt trap box lying adjacent to the existing storm sewer easement. THEREFORE BE IT RESOLVED, That the Plan Commission approve the Certified Survey Map for Metropolitan Engineering located in the SE 1/4 of Section 9 and the SW 1/4 of Section 8 and recommend approval to the Common Council subject to approval of the City Engineer and payment of all applicable fees in Section 10 of the Land Division Ordinance and subject to an additional 10 foot maintenance easement being shown on the Certified Survey Map adjacent to the existing 20 foot drainage easement to provide access to the silt trap box. BE IT FURTHER RESOLVED, That a note be placed on the face of the Certified Survey Map stating that no Building Permit Committee resolving the issue of the suggested drain tile and shall be issued for these lots prior to the Public Works the treatment of the water from the suggested drain tile prior to entering the lake. Plan Commission City of Muskego Adopted 08-03-93 Defeated Deferred 07-27-93