Loading...
PCR1993014RESOLUTION #P.C. 14-93 APPROVAL OF PRELIMINARY PLAT FOR FOXBORO NORTH SUBDIVISION IN THE SW 1/4 OF SECTION 11 FOR KOSOBUCKI BROTHERS 1992, to divide property in the SW 1/4 of Section 11 into thirty-five single family lots with RS-2 zoning, and WHEREAS, A Preliminary Plat was submitted on December 18, 208-92 subject to; deed restrictions being placed on lots adjacent to Woods Road to restrict access to Woods Road, suitable access being provided to the WEPCO Right-of-way between lots 15 and 16, the bike path being installed at the same time as the first lift of asphalt, and WHEREAS, The sketch was approved through Resolution #P.C. WHEREAS, The Preliminary Plat substantially conforms to the previously approved sketch wherein the lots meet the minimum size and width requirements for the proposed use and zoning district requirements. the Preliminary Plat for Foxboro North Subdivision in the SW 1/4 of Section 11 and will be receptive to a Final Plat being submitted subject to: THEREFORE BE IT RESOLVED, That the Plan Commission approve 0 1. The City Engineers comments of December 22, 1992 being addressed on the Final Plat with the exception of items 6, I, and 8 which must be addressed through the Public Works and Public Utilities Committees. and the Wisconsin Department of Agriculture, Trade and Consumer 2. Addressing the items from Waukesha County Park and Planning Protection. 3. Deed restrictions being placed on lots adjacent to Woods Road to restrict access to Woods Road, suitable access being provided to the WEPCO Right-of-way between lots 15 and 16, and the bike path being installed at the same time as the first lift of asphalt. Plan Commission City of Muskego Adopted 02-02-93 Defeated Deferred 01-26-93