PCR1993014RESOLUTION #P.C. 14-93
APPROVAL OF PRELIMINARY PLAT FOR FOXBORO NORTH SUBDIVISION
IN THE SW 1/4 OF SECTION 11 FOR KOSOBUCKI BROTHERS
1992, to divide property in the SW 1/4 of Section 11 into
thirty-five single family lots with RS-2 zoning, and
WHEREAS, A Preliminary Plat was submitted on December 18,
208-92 subject to; deed restrictions being placed on lots
adjacent to Woods Road to restrict access to Woods Road,
suitable access being provided to the WEPCO Right-of-way between
lots 15 and 16, the bike path being installed at the same time
as the first lift of asphalt, and
WHEREAS, The sketch was approved through Resolution #P.C.
WHEREAS, The Preliminary Plat substantially conforms to the
previously approved sketch wherein the lots meet the minimum
size and width requirements for the proposed use and zoning
district requirements.
the Preliminary Plat for Foxboro North Subdivision in the SW 1/4
of Section 11 and will be receptive to a Final Plat being
submitted subject to:
THEREFORE BE IT RESOLVED, That the Plan Commission approve
0 1. The City Engineers comments of December 22, 1992 being
addressed on the Final Plat with the exception of items 6, I,
and 8 which must be addressed through the Public Works and
Public Utilities Committees.
and the Wisconsin Department of Agriculture, Trade and Consumer
2. Addressing the items from Waukesha County Park and Planning
Protection.
3. Deed restrictions being placed on lots adjacent to Woods Road
to restrict access to Woods Road, suitable access being provided
to the WEPCO Right-of-way between lots 15 and 16, and the bike
path being installed at the same time as the first lift of
asphalt.
Plan Commission
City of Muskego
Adopted 02-02-93
Defeated
Deferred
01-26-93