Loading...
PCR1992233AMENDED APPROVAL OF CERTIFIED SURVEY MAP FOR TWO PARCELS IN THE NE 1/4 RESOLUTION #P.C. 233-92 OF SECTION 5 FOR PAUL DEANGELIS (GOLD AND SCHOOL DRIVES) 181-92 for a land division for three parcels consisting of 2.68 WHEREAS, A sketch was approved through Resolution #P.C. acres in the NE 1/4 of Section 5 and the proposed Certified Survey Map contains two lots, and WHEREAS, This land is presently zoned RS-3/0ED which average width of 15 feet and the proposed land divisions meet requires a minimum lot size of 11,250 square feet and a minimum District, and the lot size and width requirements of the RS-3/0ED Zoning WHEREAS, The Parcel is proposed to be served by municipal sewer from Gold Drive and with access to the property for the two lots from School Drive. NOW THEREFORE BE IT RESOLVED, That the Plan Commission approve the Certified Survey Map creating a land division in the NE 1/4 of Section 5 and recommend approval to the Common Council subject to approval of the City Engineers, and payment of all fees in Section 10 of the Land Division Ordinance. BE IT FURTHER RESOLVED, That a eight foot wide asphalt driveway is required within 12 months of the occupancy permit for the first house on either Parcel 1 or 2. BE IT FURTHER RESOLVED, That an eight foot wide drive be placed on each lot at the lot line from School Drive, subject to Board.of Appeals approval, unless lot 2 is accessed from Gold Drive in which case only lot 1 is required to place an eight foot drive on the lot line. BE IT FURTHER RESOLVED, That a note be placed on the face of the Certified Survey Map restricting vehicular access to lot 2 to a single access from either Gold Drive or School Drive and driveway is required to be removed from the floodplain in that if the access to lot 2 i.s provided from Gold Drive, the accordance with all agency approval processes. Plan Commission City of Muskego Adopted 10-20-92 - Defeated Deferred 8/12/92 Rev. 10/23/92