PCR1992131APPROVAL OF SKETCH FOR LAND DIVISION FOR TWO (2) LOTS IN THE NE
RESOLUTION #P.C. 131-92
1/4 OF SECTION 29 FOR HAROLD DEBACK
division for two lots in the NE 1/4 of Section 29, and
WHEREAS, A sketch was submitted on June 10, 1992 for a land
size of 80,000 square feet and a minimum average width of 200
feet, and
WHEREAS, This land is zoned R-1 which requires a minimum lot
WHEREAS, The proposed land division meets the lot size and
width requirements of the R-1 Zoning District, and
WHEREAS, The land division proposes to create one parcel of
approximately 2.5 acres and another parcel of approximately 11.5
acres, and
WHEREAS, Soils information has not been received by the City
which indicate whether the on-site soils are suitable for a
mound system, and
WHEREAS, The proposed land division is shown to have one lot
accessed from Parker Road and the other being accessed from
either Parker Road or Christopher Lane (a previously dedicated
40 foot wide future road right-of-way).
NOW THEREFORE BE IT RESOLVED, That the Plan Commission will
be receptive to a Certified Survey Map being submitted creating
a land division in the NE 1/4 of Section 29 subject to the
submittal of documentation of a satisfactory perc test.
BE IT FURTHER RESOLVED, That notes be placed on the
certified survey map stating that "No City maintenance of the
dedicated Right-of-way for Christopher Drive will be provided
until the Right-of-way is improved to City standards"; and "the
proportionate cost of the improvements necessary to bring the
Right-of-way up to City street standards will be borne by the
property owners benefiting from the improvements"; and "Parcel 2
is not developable until documentation is presented to the City
of a satisfactory perc test".
Adopted
Defeated
Deferred
Plan Commission
City of Muskego