Loading...
PCR1992102APPROVAL OF AMENDED BUILDING, SITE AND OPERATION PLAN FOR RESOLUTION 102-92 DELTA IN THE MUSKEG0 INDUSTRIAL PARK W188 S8393 MERCURY DRIVE AMENDED S8393 Mercury Drive was submitted by Tom Murphy of the Delta Group WHEREAS, An amended building, site and operation plan for W188 on April 23, 1992, and WHEREAS, The Plan Commission on March 6, 1990 adopted a building, site and operation plan through Resolution #P.C. 44-90, with the condition that the area up to the future addition be asphalted within one year, and WHEREAS, The Delta Group wishes to amend the building, site and operation plan and this amendment requires Plan Commission approval. THEREFORE BE IT RESOLVED, That the following items need to be addressed within the time-frames specified in order to bring the site plan into compliance: from the City's Erosion Control Inspector as follows within thirty 1. Erosion control measures as per the April 7, 1992 memorandum (30) days: a) correction of three problem areas, two on the south b) vegetation and rip-rap of these three problem areas. c) cleaning out of the public drainageways of 6" to 10" of silt to the level of the concrete invert. d) entire swale to be sodded and outlet areas to be covered with filter fabric and then rip-rapped with 6"-8" rip-rap. e) temporary placement of stone mulch along the sides of the drives, culverts to be regraded and lined with filter fabric then rip-rapped. perimeter and one on the north perimeter. 2. The minutes from the March 16, 1990 Plan Commission meeting building. With the completion of the fence and screening, the stated that the dumpsters were to be located inside the dumpsters are permitted outside the building. They are to be placed on the west side of the building in one specific location. This includes any scrap dumpster. 3. The minutes from the March 16, 1990 meeting stated that there was to be no outside storage. All stored material located on the west wall outside of the building is to be removed within thirty (30) days. 4. Siding to be replaced with fibreglass siding, concrete walls months. Ductwork to be repainted by July 1, 1992. to be repainted, and overhead doors to be replaced within six (6) 5. Asphalting and graveling to be completed as shown on the revised site plan including the entrances and areas in front of loading areas, roof drainage is to be routed to the ditch. Entrance aprons to be widened, repaved or concreted within two (2) years, remaining site within two (2) years. If drives are ever in year, the Plan Commission shall review this requirement. state of disrepair, gravel must go in immediately. After one (1) approved landscaping plan with the exception of the "seeded lawn" 6. The landscaping has been completed in conformance with the proposed to be replaced with gravel. Any landscaping removed from as specified on the landscape plan. Areas shown to be seeded are within the fenced area is to be replaced on a one for one basis on the outside of the fence. Although not required, additional within sixty (60) days. plantings could enhance the overall project. This is to be done 7. The above-ground fuel storage tanks (including natural gas) were not part of the original site plan. These above ground building, site, and operation plan which was approved by the storage tanks are not sited in conformance with the approved within spill containment facilities per state codes. Corrective City. The above ground tanks are also required to be placed with state codes within six (6) months. measures are necessary to bring the storage tanks into conformance 8. After one (1) year the Plan Commission shall review for site plan compliance. BE IT FURTHER RESOLVED, That the Plan Commission approve the amended building site and operation plan for Delta Group at W188 S8393 Mercury Drive in the Muskego Industrial Park. Plan Commission City of Muskego Adopted 5-5-92 Defeated Deferred cds 5/7/92