Loading...
PCR1992068APPROVAL OF REVISED BUILDING, SITE AND OPERATION PLAN FOR ST. FRANCIS BANK AT 574 W17100 JANESVILLE ROAD RESOLUTION 68-92 the St. Francis Savinqs and Loan (Bank) throuah Resolution #P.C. WHEREAS, Building, site, and operation plans were approved for 2-77 in 1977 and the parking layout was approGed through Resolution #P.C. 14-71, and 172-89 to relocate the TYME machine, and WHEREAS, The site plan was amended through Resolution #P.C. submitted on March 17, 1992, to allow construction of concrete islands with landscaping, and WHEREAS, Revised building, site and operation plans were revisions will alter the traffic flow to eliminate traffic from WHEREAS, The proposed building, site, and operation plan entering the site from the east through the Parkland Mall parking lot and will enhance the landscaping surrounding the building. THEREFORE BE IT RESOLVED, That the Plan Commission approve the revised building, site, and operation plan for St. Francis Bank at S74 W17100 Janesville Road which will include landscaping within 0 the concrete islands. City of Muskego Plan Commission Adopted y- 7-97- Defeated Deferred cds 3/27/92