PCR1991230APPROVAL TO CONSTRUCT A POND AMENDED RESOLUTION #P.C. 230-91 FOR DYER/BARRETT AT W208 S8903 HILLENDALE Hillendale was approved in Resolution #P.C. 9-90 and Common Council Resolution #124-91, and WHEREAS, A plan for the construction of a pond at W208 58903 WHEREAS, The letter of credit expired on 10/1/91, and WHEREAS, The conditions of Common Council Resolution #124 - 91 have not been met, and WHEREAS, At the City Attorney's request the $27,000 in the letter of credit has been deposited with the city, and WHEREAS, This $27,000 was to restore the disturbed areas of the pond and to designate the route of travel, and WHEREAS, The request made by DyerfBarrett does not include the further removal of any clay at W208 Sa903 Hillendale. THEREFORE BE IT RESOLVED, That the Plan Commission approve the Hillendale Drive. request to construct a pond for Dyer/Barrett at W208 58903 BE IT FURTHER RESOLVED, That the approval of the pond is subject to the following conditions: 1. The pond shall be completed in accordance with the approved excavation and grading site plan attached as Exhibit A. 2. The site shall be contoured and seeded by May 31, 1992. 3. The site shall be completely restored by July 31, 1992 and shall be inspected by the City by July 31, 1991 to ensure complete compliance with this Resolution and Exhibit A. 4. Hours of operation shall be from 7:OO A.M. to & days a week. 5. Submittal of a $27,000.00 financial gurantee for road deadlines established in numbers two (2) and three (3) above. restoration, soil erosion control, and compliance with the 6. That erosion controls be provided as per Exhibit A and the City's Erosion Control Ordinance. 7. Trucks are to travel directly North to County Highway L when exiting the site. 8. That all applicable requirements of Section 17.6.07 of the City‘s Zoning Ordinance shall be met. Plan Commission City of Muskego I Adopted Defeated Deferred cds 12/31/91 APPROVAL TO CONSTRUCT A POND AMENDED RESOLUTION #P.C. 230-91 FOR DYER/BARRETT AT W208 58903 HILLENDALE WHEREAS, A plan for the construction of a pond at W208 S8903 Hillendale was approved in Resolution #P.C. 9-90 and Common Council Resolution #124-91, and WHEREAS, The letter of credit expired on 10/1/91, and WHEREAS, The conditions of Common Council Resolution #124 - 91 have not been met, and WHEREAS, At the City Attorney's request the $27,000 in the letter of credit has been deposited with the city, and the pond and to designate the route of travel, and WHEREAS, This $27,000 was to restore the disturbed areas of further removal of any clay at W208 S8903 Hillendale. WHEREAS, The request made by Dyer/Barrett does not include the THEREFORE BE IT RESOLVED, That the Plan Commission approve the Hillendale Drive. request to construct a pond for Dyer/Barrett at W208 58903 BE IT FURTHER RESOLVED, That the approval of the pond is subject to the following conditions: 1. The pond shall be completed in accordance with the approved excavation and grading site plan attached as Exhibit A. 2. The site shall be contoured and seeded by May 31, 1992. 3. The site shall be completely restored by July 31, 1992 and shall be inspected by the City by July 31, 1991 to ensure complete compliance with this Resolution and Exhibit A. 4. Hours of operation shall be from 7:OO A.M. to 5:OO P.M. six days a week. 5. Submittal of a $27,000.00 financial gurantee for road restoration, soil erosion control, and compliance with the deadlines established in numbers two (2) and three (3) above. City's Erosion Control Ordinance. 6. That erosion controls be provided as per Exhibit A and the 0 7. Trucks are to travel directly North to County Highway L when exiting the site. City's Zoning Ordinance shall be met. 8. That all applicable requirements of Section 17.6.07 of the Plan Commission City of Muskego Adopted Defeated Deferred 12/17/91 I -?~9% /-A/- 9z Deferred cds 12/31/91 APPROVAL TO CONSTRUCT A POND FOR DYER/BARRETT AMENDED RESOLUTION #P.C. 230-91-A AT WZO8 S8903 HILLENDALE Hillendale was approved in Resolution #P.C. 9-90 and Common Council Resolution #124-91, and WHEREAS, A plan for the construction of a pond at W208 58903 WHEREAS, The letter of credit expired on 10/1/91, and WHEREAS, The conditions of Common Council Resolution #124-91 have not been met, and credit has been deposited with the City, and WHEREAS,At the City Attorney's request, $27,000 in a letter of restoration of the disturbed areas of the pond (topsoil restoration) and to ensure restoration of the road. WHEREAS, This $27,000 letter of credit was to ensure THEREFORE BE IT RESOLVED, That the Plan Commission approve the request to construct a pond for DyerfBarrett at W208 58903 Hillendale Drive. BE IT FURTHER RESOLVED, That the approval of the pond is subject to the following conditions: approved excavation and grading site plan dated January 16, 1992, and attached as Exhibit A. 1. The pond shall be completed in accordance with the 2. There shall not be more than another 300 cubic yards of clay extracted from the property, to create a tapered beach area. No additional hauling of'clay shall take place unless authorized by the Public Works Superintendent or until April 15, 1992, whichever is earlier. location on the north end of the pond will be spread and leveled 3. The topsoil from the site, which has been piled at a throughout the site. The area will be seeded so that grass covers all disturbed areas remaining from the pond construction. The topsoil will be fine graded, mulched and fertilized, then seeded disturbed areas. If there is insufficient topsoil remaining on as necessary to ensure that grassy vegetation is in place in all not more than forty (40) cubic yards) will be brought in to the site to complete the restoration work, additional topsoil (but complete the restoration and reseeding of the disturbed areas. 4. All work on the site shall be completed by May 31, 1992. 0 5. The site shall be completely restored by July 31, 1992, and shall be inspected by the City by July 31, 1992, to ensure complete compliance with this Resolution and Exhibit A. '. up to 150 cubic yards of sand hauled in to cover the beach area at 6. There shall be a minimum of 80 cubic yards and, if needed, the southeast edge of the pond (as depicted on Exhibit A). 7. Hours of operation shall be from 7:OO AM to 5:OO PM six days a week. 8. Submittal of a $27,000 financial guarantee in the form of a letter of credit to ensure, to the City's satisfaction, road restoration, soil erosion control, and compliance with the deadlines established in numbers four (4) and five (5) above. 9. Rip-rap will be hauled in to cover the areas of water flow at the northwest and southwest corners of the pond, berms will be built along the east and west edges of the pond, and large decorative rocks (specifically oversized fieldstone in excess of two (2) feet in diameter placed every four (4) feet along the east side of the pond, between the pond and the driveway) will be put enhance safety for vehicles using the driveway. in place along the driveway edge on the east edge of the pond to 10. All areas disturbed or damage done by equipment or work done pursuant to this Resolution shall be restored and/or repaired. 11. That erosion controls be provided as per the City's 0 Erosion Control Ordinance. when exiting the site. 12. Trucks are to travel directly North to County Highway L condition as of the date of this agreement. 13. The private road off Hillendale will be maintained in the Plan Commission By: GeSaldine K. Solbria Attorney for Trucking & Leasin InC. 9 TruckingLLeasing, Inc. (contractor) By: GeneGal Manager of Trucking h Leasing, Inc. Adopted ” Defeated Deferred LJK/cds 3/3/92 APPROVAL TO CONSTRUCT A POND FOR DYER/BARRETT AMENDED RESOLUTION #P.C. 230-91-A AT W208 58903 HILLENDALE WHEREAS, A plan for the construction of a pond at W208 58903 Hillendale was appr0ve.d in Resolution #P.C. 9-90 and Common Council Resolution #124-91, and WHEREAS, The letter of credit expired on 10/1/91, and WHEREAS, The conditions of Common Council Resolution #124-91 have not been met, and WHEREAS,At the City Attorney's request, $27,000 in a letter of credit has been deposited with the City, and WHEREAS, This $27,000 letter of credit was to ensure restoration of the disturbed areas of the pond (topsoil restoration) and to ensure restoration of the road. THEREFORE BE IT RESOLVED, That the Plan Commission approve the Hillendale Drive. request to construct a pond for DyerIBarrett at W208 S8903 0 BE IT FURTHER RESOLVED, That the approval of the pond is subject to the following conditions: 1. The pond shall be completed in accordance with the approved excavation and grading site plan dated January 16, 1992, and attached as Exhibit A. 2. There shall not be more than another 300 cubic yards of clay extracted from the property, to create a tapered beach area. No additional hauling of'clay shall take place unless authorized whichever is earlier. by the Public Works Superintendent or until April 15, 1992, 3. The topsoil from the site, which has been piled at a location on the north end of the pond will be spread and leveled throughout the site. The area will be seeded so that grass covers all disturbed areas remaining from the pond construction. The topsoil will be fine graded, mulched and fertilized, then seeded as necessary to ensure that grassy vegetation is in place in all disturbed areas. If there is insufficient topsoil remaining on the site to complete the restoration work, additional topsoil (but not more than forty (40) cubic yards) will be brought in to complete the restoration and reseeding of the disturbed areas. 4. All work on the site shall be completed by May 31, 1992. 5. The site shall be completely restored by July 31, 1992, and shall be inspected by the City by July 31, 1992, to ensure complete compliance with this Resolution and Exhibit A. e 6. There shall be a minimum of 80 cubic yards and, if needed, up to 150 cubic yards of sand hauled in to cover the beach area at the southeast edge of the pond (as depicted on Exhibit A). 7. Hours of operation shall be from 7:OO AM to 5:OO PM six days a week. 8. Submittal of a $27,000 financial guarantee in the form of a letter of credit to ensure, to the City's satisfaction, road restoration, soil erosion control, and compliance with the deadlines established in numbers four (4) and five (5) above. at the northwest and southwest corners of the pond, berms will be built along the east and west edges of the pond, and large decorative rocks (specifically oversized fieldstone in excess of two (2) feet in diameter placed every four (4) feet along the east side of the pond, between the pond and the driveway) will be put in place along the driveway edge on the east edge of the pond to enhance safety for vehicles using the driveway. 9. Rip-rap will be hauled in to cover the areas of water flow 10. All areas disturbed or damage done by equipment or work done pursuant to this Resolution shall be restored and/or repaired. 0 11. That erosion controls be provided as per the City's Erosion Control Ordinance. 12. Trucks are to travel directly North to County Highway L when exiting the site. 13. The private road off Hillendale will be maintained in the condition as of the date of this agreement. Plan Commission City of Muskego Ge6aldine K. Solbriq Attorney for Trucking & Leasin Inc. 3' c .. Trucking GLeasing, Inc. (contractor) By : General Manager of Trucking & Leasing, Inc. Adopted Defeated Deferred LJK/cds 3/3/92