PCR1991230APPROVAL TO CONSTRUCT A POND
AMENDED
RESOLUTION #P.C. 230-91
FOR DYER/BARRETT AT W208 S8903 HILLENDALE
Hillendale was approved in Resolution #P.C. 9-90 and Common
Council Resolution #124-91, and
WHEREAS, A plan for the construction of a pond at W208 58903
WHEREAS, The letter of credit expired on 10/1/91, and
WHEREAS, The conditions of Common Council Resolution #124 - 91
have not been met, and
WHEREAS, At the City Attorney's request the $27,000 in the
letter of credit has been deposited with the city, and
WHEREAS, This $27,000 was to restore the disturbed areas of
the pond and to designate the route of travel, and
WHEREAS, The request made by DyerfBarrett does not include the
further removal of any clay at W208 Sa903 Hillendale.
THEREFORE BE IT RESOLVED, That the Plan Commission approve the
Hillendale Drive.
request to construct a pond for Dyer/Barrett at W208 58903
BE IT FURTHER RESOLVED, That the approval of the pond is
subject to the following conditions:
1. The pond shall be completed in accordance with the approved
excavation and grading site plan attached as Exhibit A.
2. The site shall be contoured and seeded by May 31, 1992.
3. The site shall be completely restored by July 31, 1992 and shall
be inspected by the City by July 31, 1991 to ensure complete
compliance with this Resolution and Exhibit A.
4. Hours of operation shall be from 7:OO A.M. to & days
a week.
5. Submittal of a $27,000.00 financial gurantee for road
deadlines established in numbers two (2) and three (3) above.
restoration, soil erosion control, and compliance with the
6. That erosion controls be provided as per Exhibit A and the
City's Erosion Control Ordinance.
7. Trucks are to travel directly North to County Highway L when
exiting the site.
8. That all applicable requirements of Section 17.6.07 of the
City‘s Zoning Ordinance shall be met.
Plan Commission
City of Muskego
I Adopted
Defeated
Deferred
cds
12/31/91
APPROVAL TO CONSTRUCT A POND
AMENDED
RESOLUTION #P.C. 230-91
FOR DYER/BARRETT AT W208 58903 HILLENDALE
WHEREAS, A plan for the construction of a pond at W208 S8903
Hillendale was approved in Resolution #P.C. 9-90 and Common
Council Resolution #124-91, and
WHEREAS, The letter of credit expired on 10/1/91, and
WHEREAS, The conditions of Common Council Resolution #124 - 91
have not been met, and
WHEREAS, At the City Attorney's request the $27,000 in the
letter of credit has been deposited with the city, and
the pond and to designate the route of travel, and
WHEREAS, This $27,000 was to restore the disturbed areas of
further removal of any clay at W208 S8903 Hillendale.
WHEREAS, The request made by Dyer/Barrett does not include the
THEREFORE BE IT RESOLVED, That the Plan Commission approve the
Hillendale Drive.
request to construct a pond for Dyer/Barrett at W208 58903
BE IT FURTHER RESOLVED, That the approval of the pond is
subject to the following conditions:
1. The pond shall be completed in accordance with the approved
excavation and grading site plan attached as Exhibit A.
2. The site shall be contoured and seeded by May 31, 1992.
3. The site shall be completely restored by July 31, 1992 and shall
be inspected by the City by July 31, 1991 to ensure complete
compliance with this Resolution and Exhibit A.
4. Hours of operation shall be from 7:OO A.M. to 5:OO P.M. six days
a week.
5. Submittal of a $27,000.00 financial gurantee for road
restoration, soil erosion control, and compliance with the
deadlines established in numbers two (2) and three (3) above.
City's Erosion Control Ordinance.
6. That erosion controls be provided as per Exhibit A and the
0 7. Trucks are to travel directly North to County Highway L when exiting the site.
City's Zoning Ordinance shall be met.
8. That all applicable requirements of Section 17.6.07 of the
Plan Commission
City of Muskego
Adopted
Defeated
Deferred 12/17/91 I -?~9% /-A/- 9z
Deferred
cds
12/31/91
APPROVAL TO CONSTRUCT A POND FOR DYER/BARRETT
AMENDED
RESOLUTION #P.C. 230-91-A
AT WZO8 S8903 HILLENDALE
Hillendale was approved in Resolution #P.C. 9-90 and Common
Council Resolution #124-91, and
WHEREAS, A plan for the construction of a pond at W208 58903
WHEREAS, The letter of credit expired on 10/1/91, and
WHEREAS, The conditions of Common Council Resolution #124-91
have not been met, and
credit has been deposited with the City, and
WHEREAS,At the City Attorney's request, $27,000 in a letter of
restoration of the disturbed areas of the pond (topsoil
restoration) and to ensure restoration of the road.
WHEREAS, This $27,000 letter of credit was to ensure
THEREFORE BE IT RESOLVED, That the Plan Commission approve the
request to construct a pond for DyerfBarrett at W208 58903
Hillendale Drive.
BE IT FURTHER RESOLVED, That the approval of the pond is
subject to the following conditions:
approved excavation and grading site plan dated January 16, 1992,
and attached as Exhibit A.
1. The pond shall be completed in accordance with the
2. There shall not be more than another 300 cubic yards of
clay extracted from the property, to create a tapered beach area.
No additional hauling of'clay shall take place unless authorized
by the Public Works Superintendent or until April 15, 1992,
whichever is earlier.
location on the north end of the pond will be spread and leveled
3. The topsoil from the site, which has been piled at a
throughout the site. The area will be seeded so that grass covers
all disturbed areas remaining from the pond construction. The
topsoil will be fine graded, mulched and fertilized, then seeded
disturbed areas. If there is insufficient topsoil remaining on
as necessary to ensure that grassy vegetation is in place in all
not more than forty (40) cubic yards) will be brought in to
the site to complete the restoration work, additional topsoil (but
complete the restoration and reseeding of the disturbed areas.
4. All work on the site shall be completed by May 31, 1992.
0 5. The site shall be completely restored by July 31, 1992, and shall be inspected by the City by July 31, 1992, to ensure
complete compliance with this Resolution and Exhibit A.
'. up to 150 cubic yards of sand hauled in to cover the beach area at
6. There shall be a minimum of 80 cubic yards and, if needed,
the southeast edge of the pond (as depicted on Exhibit A).
7. Hours of operation shall be from 7:OO AM to 5:OO PM six
days a week.
8. Submittal of a $27,000 financial guarantee in the form of
a letter of credit to ensure, to the City's satisfaction, road
restoration, soil erosion control, and compliance with the
deadlines established in numbers four (4) and five (5) above.
9. Rip-rap will be hauled in to cover the areas of water flow
at the northwest and southwest corners of the pond, berms will be
built along the east and west edges of the pond, and large
decorative rocks (specifically oversized fieldstone in excess of
two (2) feet in diameter placed every four (4) feet along the east
side of the pond, between the pond and the driveway) will be put
enhance safety for vehicles using the driveway. in place along the driveway edge on the east edge of the pond to
10. All areas disturbed or damage done by equipment or work
done pursuant to this Resolution shall be restored and/or repaired.
11. That erosion controls be provided as per the City's
0 Erosion Control Ordinance.
when exiting the site.
12. Trucks are to travel directly North to County Highway L
condition as of the date of this agreement.
13. The private road off Hillendale will be maintained in the
Plan Commission
By:
GeSaldine K. Solbria
Attorney for Trucking & Leasin InC. 9
TruckingLLeasing, Inc. (contractor)
By:
GeneGal Manager of
Trucking h Leasing, Inc.
Adopted ”
Defeated
Deferred
LJK/cds
3/3/92
APPROVAL TO CONSTRUCT A POND FOR DYER/BARRETT
AMENDED
RESOLUTION #P.C. 230-91-A
AT W208 58903 HILLENDALE
WHEREAS, A plan for the construction of a pond at W208 58903
Hillendale was appr0ve.d in Resolution #P.C. 9-90 and Common
Council Resolution #124-91, and
WHEREAS, The letter of credit expired on 10/1/91, and
WHEREAS, The conditions of Common Council Resolution #124-91
have not been met, and
WHEREAS,At the City Attorney's request, $27,000 in a letter of
credit has been deposited with the City, and
WHEREAS, This $27,000 letter of credit was to ensure
restoration of the disturbed areas of the pond (topsoil
restoration) and to ensure restoration of the road.
THEREFORE BE IT RESOLVED, That the Plan Commission approve the
Hillendale Drive.
request to construct a pond for DyerIBarrett at W208 S8903
0 BE IT FURTHER RESOLVED, That the approval of the pond is
subject to the following conditions:
1. The pond shall be completed in accordance with the
approved excavation and grading site plan dated January 16, 1992,
and attached as Exhibit A.
2. There shall not be more than another 300 cubic yards of
clay extracted from the property, to create a tapered beach area.
No additional hauling of'clay shall take place unless authorized
whichever is earlier.
by the Public Works Superintendent or until April 15, 1992,
3. The topsoil from the site, which has been piled at a
location on the north end of the pond will be spread and leveled
throughout the site. The area will be seeded so that grass covers
all disturbed areas remaining from the pond construction. The
topsoil will be fine graded, mulched and fertilized, then seeded
as necessary to ensure that grassy vegetation is in place in all
disturbed areas. If there is insufficient topsoil remaining on
the site to complete the restoration work, additional topsoil (but
not more than forty (40) cubic yards) will be brought in to
complete the restoration and reseeding of the disturbed areas.
4. All work on the site shall be completed by May 31, 1992.
5. The site shall be completely restored by July 31, 1992,
and shall be inspected by the City by July 31, 1992, to ensure
complete compliance with this Resolution and Exhibit A.
e 6. There shall be a minimum of 80 cubic yards and, if needed,
up to 150 cubic yards of sand hauled in to cover the beach area at
the southeast edge of the pond (as depicted on Exhibit A).
7. Hours of operation shall be from 7:OO AM to 5:OO PM six
days a week.
8. Submittal of a $27,000 financial guarantee in the form of
a letter of credit to ensure, to the City's satisfaction, road
restoration, soil erosion control, and compliance with the
deadlines established in numbers four (4) and five (5) above.
at the northwest and southwest corners of the pond, berms will be
built along the east and west edges of the pond, and large
decorative rocks (specifically oversized fieldstone in excess of
two (2) feet in diameter placed every four (4) feet along the east
side of the pond, between the pond and the driveway) will be put
in place along the driveway edge on the east edge of the pond to
enhance safety for vehicles using the driveway.
9. Rip-rap will be hauled in to cover the areas of water flow
10. All areas disturbed or damage done by equipment or work
done pursuant to this Resolution shall be restored and/or repaired.
0
11. That erosion controls be provided as per the City's
Erosion Control Ordinance.
12. Trucks are to travel directly North to County Highway L
when exiting the site.
13. The private road off Hillendale will be maintained in the
condition as of the date of this agreement.
Plan Commission
City of Muskego
Ge6aldine K. Solbriq
Attorney for Trucking & Leasin Inc. 3'
c ..
Trucking GLeasing, Inc. (contractor)
By :
General Manager of
Trucking & Leasing, Inc.
Adopted
Defeated
Deferred
LJK/cds
3/3/92