Loading...
PCR1991138APPROVAL OF BUILDING, SITE & OPERATION PLAN FOR SAFEWAY PEST AMENDED RESOLUTION #P.C. 138-91 CONTROL COMPANY, INC. IN THE INDUSTRIAL PARK WHEREAS, A site plan and construction drawings have been submitted by Safeway Pest. Control Company, Inc. for purposes of constructing a warehouse on Lot 3 of Block 5 of the Industrial Park Addition, and WHEREAS, The building location meets the zoning requirements of the city's 1-1 zone district, and WHEREAS, The construction drawings indicated that the south elevation of the building and a portion of the east building elevation will have a brick veneer, which meets the requirement for the Industrial Park, and WHEREAS, The site plan indicates that there will be spaces for employees and customer parking within the required setbacks for such parking. - THEREFORE BE IT RESOLVED, That the Plan Commission aDDrOVe the Company, Inc. building, site and construction drawings for Safeway Pest-Control BE IT FURTHER RESOLVED, That the plan for landscaping, lighting and signage would be required to be reviewed by the Plan Commission prior to their installation. BE IT FURTHER RESOLVED, That weather permitting, the parking area and driveway be asphalted prior to occupancy; the overhang be extended across the entire length of the building on the south elevation. Plan Commission City of Muskego Adopted Defeated Deferred cds 7/31/91 - -