Loading...
PCR19911198 APPROVAL OF CONDITIONAL USE GRANT TO DISTRIBUTE YARD WASTE OVER RESOLUTION #P.C. 119-91 PROPERTY LOCATED AT SllO W14800 UNION CHURCH DRIVE BFI WASTE SYSTEMS AMENDED WHEREAS, A site plan and description of operation has been submitted by John Jewel1 of BFI Waste Systems, and WHEREAS, The applicat.ion is a request to spread grass clippings, brush and leaves over approximately 15 acres of property zoned Exclusive Agriculture, and WHEREAS, The Exclusive Agriculture zone district allows experimental uses of property related to agriculture with a conditional use grant, an.d WHEREAS, The site plan indicates that the area to be used for the operation will not en.croach into the shoreland/wetland, and rubbish or other solid waste material be allowed to be disposed of WHEREAS, The operation plan indicates that no plastic bags, at the site. 0 THEREFORE BE IT RESOLVED, That the Plan Commission approve the conditional use grant for BFI Waste Systems. BE IT FURTHER RESOLVED, That the approval be subject to the following conditions: 1. That the material conveyed to the site will consist of grass clippings, leaves and small brush and shall not contain any other type of waste material, rubbish or trash. 2. That the material conveyed to the site shall not exceed 20,000 cubic yards and that the material shall be spread only within the area described on the applicant's site plan (map). 3. That the material will be spread to a 6" depth and rototilled into the soil to control wind erosion of the materials immediately upon arrival at the site it will also then be if conditions are right for spreading (weather permitting) or within 12 hours. 4. That the delivery of the waste material shall take place only during the hours of 9:30 AM - 4:30 PM, Monday - Friday and 1O:OO AM - 1:00 PM Saturday during April 15th - December 1st. Delivery to Waste Management site on College Court be from 8:OO AM to Noon for Muskego residents with free collection privileges. engineers for their approval of the construction of the berms, 5. That prior to the operation a plan be submitted to the retention ponds, surface water drainage and erosion control devices. after one year monitored :by the Department of Natural Resources. 6. That the operatio:n be reviewed by the Plan Commission be approved by the Department of Public Works and the Police Department with a road bo:nd in the amount of $40,000 established for road repairs. I. That the traffic :pattern for trucking to and from the site on a monthly basis and nutrients checked. 8. That a test program be established to monitor heavy metals 9. That a Committee :be established with 4 residents appointed by the Common Council p1u.s the zoning officer with a budget not to exceed $1,000. 10. This approval is subject to an amended site plan for the College Court BFI site be approved. Plan Commission City of Muskego Adopted P- ,ao-9/ - I 0 Defeated - Deferred - cds 6/27/91 APPROVAL OF CONDITIONAL USE GRANT TO DISTRIBUTE YARD WASTE OVER RESOLUTION #P.C. 119-91 PROPERTY LOCATED AT SllO W14800 UNION CHURCH DRIVE BFI WASTE SYSTEMS submitted by John Jewel1 of BFI Waste Systems, and WHEREAS, A site plan and description of operation has been WHEREAS, The application is a request to spread grass property zoned Exclusive Agriculture, and clippings, brush and leaves over approximately 15 acres of WHEREAS, The Exclusive Agriculture zone district allows experimental uses of property related to agriculture with a conditional use grant, and the operation will not encroach into the shoreland/wetland, and rubbish or other solid waste material be allowed to be disposed of WHEREAS, The operation plan indicates that no plastic bags, at the site. WHEREAS, The site plan indicates that the area to be used for THEREFORE BE IT RESOLVED, That the Plan Commission approve the conditional use grant for BFI Waste Systems. BE IT FURTHER RESOLVED, That the approval be subject to the following conditions: 1. That the material conveyed to the site will consist of grass clippings, leaves and small brush and shall not contain any other type of waste material, rubbish or trash. 2. That the material conveyed to the site shall not exceed 20,000 cubic yards and that the material shall be spread only within the area described on the applicant's site plan (map). 3. That the material will be spread and immediately upon arrival at the site it will also then be disced into the soil to control wind erosion of the materials. and discing shall take place only during the hours of 9:30 AM - 4:30 PM, Monday - Friday and 9:00 AM - 12:OO Noon Saturday. 4. That the delivery of the waste material spreading engineers for their appro'val of the construction of the berms, 5. That prior to the operation a plan be submitted to the retention ponds, surface water drainage and erosion control devices. after one year. 6. That the operation be reviewed by the Plan Commission 7. That the traffic pattern for trucking to and from the site be approved by the Department of Public Works and the Police I Department. Plan Commission City of Muskego Adopted - Defeated - Deferred cds 6/27/91 -~ ” . 7-/by 9/ -