Loading...
PCR1991094APPROVAL OF REVISED BIJILDING, SITE & OPERATION PLAN FOR CUSTOM RESOLUTION #P.C. 94-91 WIRE ASSEMBLY, INC. IN MUSKEG0 INDUSTRIAL PARK WHEREAS, A revised building, site and operation plan has been submitted for Custom Wire Assembly, Inc. in the Muskego Industrial Park, and WHEREAS, Custom Wire is proposing to relocate their manufacturing building to a property east of their former proposed site, and PC41-91, and WHEREAS, The site plan €or their previous site was approved in WHEREAS, The new site plan will show three driveway entrances onto Saturn Drive. WHEREAS, The building will be relocated on the site such that the office area faces east, and change, and WHEREAS, The remainin.9 portion of the site plan will not WHEREAS, The dimensions of the building and architectural construction will remain the same. THEREFORE BE IT RESOLVED, That the Plan Commission approve the new proposed location in the Muskego Industrial Park. revised building, site and operation plan for Custom Wire at the Adopted 5/2//7 .I Defeated Deferred cds 5/11/91 Plan Commission City of Muskego