Loading...
PCR1989197RESOLUTION ~P.c. 197-89 APPROVAL OF BUILDING, SITE & OPERATION PLAN NE 114 OF SECTION 2 ON THE SE CORNER OF COLLEGE & COLLEGE CT. BFI WASTE SYSTEMS WHEREAS, It is proposed to construct a 96' x 64' office building on the property in the NE 1/4 of Section 2 on the SE corner of College and College Court, and WHEREAS, The first floor will be constructed with tri-flute concrete block and the second floor will be ribbed steel siding, and WHEREAS, There is a 20' sanitary sewer easement along the south side of the building located to the east addressed as S63 W14323 College. THEREFORE BE IT RESOLVED, That the Plan Commission approve the building, site and operation plan and be receptive to a landscaping plan which will include any additional signage and exterior lighting. Plan Commission City of Muskego Defeated Deferred cds 1 O/ 13/89