Loading...
PCR1987084(AMENDED) DETERMINATION OF WETLAND/FLOODPLAIN BOUNDARIES RESOLUTION #P.C. 84-87 GUMIENY-LOTS 18 h 19-LUDWIGS SUBDIVISION WHEREAS, It is proposed to sewer Bay Lane in Ludwigs Subdivision, and WHEREAS, Lots 18 and l9 are adjacent to a 20' drainage ditch, and WHEREAS, Section 3.05 (4) B of the zoning ordinance States that the boundaries of the wetland/floodplain district are intended to represent the boundaries of land not adequately drained or subject to flooding, and shall finally be determined by the actual conditions of each specific situation, and WHEREAS, An on-site inspection has been made and the wetland outlined, and WHEREAS, The on-site inspection revealed sufficient area to construct an individual home on both Lots 18 and 19. THEREFORE BE IT RESOLVED, That the Plan Commission determine the boundaries of the wetland/floodplain as shown on Exhibit A attached. BE IT FURTHER RESOLVED, That the Plan Commission will approve the filling in of the wetland depending upon the recommendation of the Corp of Engineers. Plan Commission City of Muskego Adopted L/a/g7 Defeated Deferred (Amended 6/2/87)