Loading...
PCR1987033(AMENDED) RESOLUTION #P.C. 33-87 PLACING CONDITIONS ON CONDITIONAL USE GRANT JACK CLOCKNER EXTRACTIVE PERMIT WHEREAS, A petition for a condit submitted by Jack Clockner for a legal ional use grant has been nonconforming extractive operation, and WHEREAS, It is the responsibility of the Plan Commission to place certain conditions on this operation, and WHEREAS, The public hearing was held on January 6, 1987 where the concerns of the neighbors were heard, and WHEREAS, Reports from the City Attorney and DNR have been received. THEREFORE BE IT RESOLVED, That the Plan Commission approve the conditional use grant with the following conditions: 1. Hours of operation - 7 A.M. to 7 P.M. Monday through Saturday - no Sunday operation. 2. That there will be no junk vehicles parked or stored in the excavated area. 3. That any pumping done that would adversely affect any of the surrounding wells, such pumping shall cease immediately. 4. There will be no blasting, crushing, washing of sand or gravel or other processing other than the initial removal of material. 5. A restoration bond of in the amount of $25,000 will be secured from Mr. Glockner for the site. 6. That the ponds will not exceed 15' in depth. I \ a I I 7. That the site will be graded to contour with slopes not greater than 1' to 4'. 8. That any additional equipment used in the extractive operation other than listed below must have Plan Commission approval : Two (2) dump trucks One (1) end loader Two (2) drag lines 9 That the permit be reviewed on a yearly basis. Plan Commission City of Muskego Adopted 3//3/87 Defeated Deferred (AMENDED 3/17/87) 1s