Loading...
PCR1985110AMENDED RESOLUTION #P.C. 110-85 BUILDING SITE AND OPERATION PLAN GREATER MILWAUKEE BAPTIST TEMPLE WHEREAS, The Greater Milwaukee Baptist Temple is interested School located at W125 S9791 North Cape Road, and in purching the existing school building known as Durham Hill churches and religious institutions subject to Plan Commission approval, and WHEREAS, Section 9.02 (7) a permitted use by right, permits WHEREAS, An inspection the property revealed First, The need for covers on two sepic tanks Second, The asbestos ceilings in the lower rooms must be encapsuled or removed in accordance with the rules of the E.P.A. glass is missing Third, The hallway lighting is not working and the exit Fourth, Possible roof leaks, and WHEREAS, Landscaping plans be submitted within two years. THEREFORE BE IT RESOLVED, That the Plan Commission of the City of Muskego, approve the change of use from a school to a church and religious institution. above being corrected prior to obtaining an Occupancy Permit. BE IT FURTHER RESOLVED, Approval is conditioned upon the Plan Commission City of Muskego Adopted 8120185 Defeated Deferred 8/6/85 cv 7/85