PCR1985110AMENDED
RESOLUTION #P.C. 110-85
BUILDING SITE AND OPERATION PLAN
GREATER MILWAUKEE BAPTIST TEMPLE
WHEREAS, The Greater Milwaukee Baptist Temple is interested
School located at W125 S9791 North Cape Road, and
in purching the existing school building known as Durham Hill
churches and religious institutions subject to Plan Commission
approval, and
WHEREAS, Section 9.02 (7) a permitted use by right, permits
WHEREAS, An inspection the property revealed
First, The need for covers on two sepic tanks
Second, The asbestos ceilings in the lower rooms must be
encapsuled or removed in accordance with the rules of
the E.P.A.
glass is missing
Third, The hallway lighting is not working and the exit
Fourth, Possible roof leaks, and
WHEREAS, Landscaping plans be submitted within two years. THEREFORE BE IT RESOLVED, That the Plan Commission of the
City of Muskego, approve the change of use from a school to a
church and religious institution.
above being corrected prior to obtaining an Occupancy Permit.
BE IT FURTHER RESOLVED, Approval is conditioned upon the
Plan Commission
City of Muskego
Adopted 8120185
Defeated
Deferred 8/6/85
cv
7/85