PCR1981051RESOLUTION #P, C. 51-81
APPROVAL OF CHANGE OF TOPOGRAPHY
DREDGE SITES
WHEREAS the Little Muskego Lake Protection and Rehabili-
tation District has submitted plans for three dredge sites
identified as sites "E", "G" and "M" to be used in the
rehabilitation of Little Muskego Lake, and
approved or denied by the Building Inspection Department, and
WHEREAS the change of topography and the creation of
ponds has previously required approval by the Plan Commission,
and
WHEREAS in the past the filling of low areas has been
WHEREAS the relocation of any streams also requires
approval of the Plan Commission, and
WHEREAS the development of the three dredge sites for
this project involves a change of topography and relocation of
streams and therefore requires Plan Commission approval, and
WHEREAS the Department of Natural Resources, after a
and has approved the location of the sites, and
thorough study, has prepared an environmental impact statement
WHEREAS the site-s have also been approved by the U. S.
THEREG-= BE IT T RESOLVED that the Plan Commission of
Army Corps of Engineers.
raphy in accordance with Section 6.01 (4) of the Zoning
the City of Muskego does hereby approve the change of topog-
Lake dredge sites E, G, and M.
Ordinance, and relocation of the streams, for Little Muskego
City of Muskego
Plan Commission
Adopted JUN. 2 1981
Defeated
Deferred