PCR1979182RESOLUTION #P. C. 182-79
Approval of Building, Site, Operational and Landscape Plans
Muskego BusinessIIndustrial Park
Cade Construction
WHEREAS building, site, operational and landscape plans
have been submitted to the Plan Comission by Cade Construction
for a stall-type manufacturing building to be constructed on
Lot 4 in the Muskego Business/Industrial Park, and
WHEREAS the plans indicate this will be a block building,
15,680 sq. ft. in size and is noted as Building "A" on the site
plan.
THEREFORE BE IT RESOLVED that the Plan Commission of the
City of Muskego does hereby approve the building, site, opera-
tional and landscape plans for the stall-type manufacturing
building to be constructed by Cade Construction on Lot 4 in the
Muskego Business/Industrial Park.
0
City of Muskego
Plan Comission
Adopted 2 0 1979
Defeated
Deferred