Loading...
PCR1979160RESOLUTION #P C. 100-79 ARCHITECTURAL APPROVAL OF PUMPHOUSES FOR WELLS 111 and #2 MARLAN MEADOWS WHEREAS plans have been submitted for architectural approval of two pumphouses to be located in Marlan Meadows subdivision, and WHEREAS the plans prepared by Roger M Johnson, Engineer, October 4, 1979, indicate that the pumphouse for Well No. 1 will be constructed with brick, rough-sawn cedar and asphalt shingles and will be located on Outlot 3 as shown on the site plan, and the pumphouse for Well No. 2 will be constructed with brick with cedar shake roof and will be located in the access to Outlot 1 as shown on the site plan which was approved by the Parks and Recreation Board, the Comon Council and the Plan Commission, and WHEREAS the Parks and Recreation Board has approved the pumphouse for Well #2 subject to the condition that: the driveway a be asphalted. THEREFOKE BE IT KESULVLD that the Plan Comission of the City of Muskego does hereby architecturally approve the request for two pumphouses to be located in the Marlan Meadows subdi- vision, subject to the condition that the driveways to each one be asphalted. City of Muskego Plan Commission Adopted OCT 1 6 1979 Defeated Deferred