Loading...
PCR2009047 RESOLUTION #P.C.047-2009 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDEMNT FOR ATONEMENT LUTHERAN CHURCH LOCATED IN THE SE ¼ OF SECTION 3 (S70 W16244 MARTIN DRIVE / TAX KEY NO. 2172.095) WHEREAS, On June 22, 2009 plans were submitted by Frank Waltz for a Building, Site and Operation Plan Amendment for Atonement Lutheran Church located in the SE ¼ of Section 3 (Tax Key No. 2172.095 / S70 W16244 Martin Drive), and WHEREAS, Said property is currently zoned I-1 Government, Institutional, and Public Service District and said use is a permitted use, and WHEREAS, Said property is subject to the design standards outlined in the City of Muskego’s General Design Guide, and WHEREAS, The current church and site layout were approved through the original BSO on July 17, 2007 under PC 079-2007, and WHEREAS, Within those proposed plans and within the approved resolution it was noted that there were possible future parking areas shown that would require separate approval before they would be installed, and WHEREAS, Now the petitioner is requesting the first parking lot expansion off the east side of the entry driveway, and WHEREAS, The current parking lot contains about 120 spaces and the new proposal will add about 50 additional spaces, bringing the total number of stalls to about 170, and WHEREAS, Due to the larger than expected attendance, the additional parking is now required, and WHEREAS, The new parking lot is shown with curbing throughout most of the additional area, except where there is still further expansion possibilities, and all parking stalls are shown as 10 feet by 20 feet in size, and WHEREAS, A photometric plan and parking lot lighting specifics have been submitted as part of the BSO amendment and the plans appear to meet code requirements, and WHEREAS, The pole lights are shown at 20 feet in height, which is allowed, as the structure is greater than 20 feet in height, and WHEREAS, The concrete bases of the pole lights are shown as 6 inches above grade and the bulbs are shown to be high pressure sodium, and WHEREAS, The two new proposed lights are stated to match the existing pole lights on site, and WHEREAS, The Zoning Code and General Design Guide require that the concrete bases not exceed six (6) inches above grade, and WHEREAS, The Zoning Code and General Design Guide require that all lighting fixtures be high- pressure sodium and the Planning Commission has usually only allowed metal halide when the lighting is used as an architectural feature to enhance architectural elements of the building, and WHEREAS, Landscape islands will be planted to match the existing landscape islands, and WHEREAS, Stormwater will be utilized within an existing pond on site, and WHEREAS, There are a few items that still need to be addressed from the original construction as follows:  All areas of exposed or eroded dirt must be stabilized. Specifically the front area near Martin Drive and the two large washout areas to the rear of the building.  The fire hydrant must be adjusted to an appropriate height. When the bike path was installed the elevation and grading were filled in around the hydrant. THEREFORE BE IT RESOLVED, That the Plan Commission approves of the Building, Site and Operation Plan Amendment submitted May 23by Frank Waltz for Atonement Lutheran Church located in the SE ¼ of Section 3. BE IT FURTHER RESOLVED, That the light pole bases must be six (6) inches above grade or less in height, the fixtures must be high-pressure sodium, and the poles and fixtures must match the existing. BE IT FURTHER RESOLVED, That any additional parking lot expansion areas and any possible building expansion areas, which will require a separate BSO amendment through the Planning Commission at a later date. BE IT FURTHER RESOLVED, That an Erosion and Land Disturbance Permit will be required before any work on the new parking lot can begin. BE IT FURTHER RESOLVED, That a formal inspection must be requested to the Community Development Department before the parking lot can be used so that the City can ensure that all of the previous conditions noted above and all new conditions are met and satisfactorily completed. BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Community Development Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission. BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: July 7, 2009 Defeated: Deferred: Introduced: July 7, 2009 ATTEST: Kellie McMullen, Recording Secretary