Loading...
PCR2009044 RESOLUTION #P.C. 044-2009 APPROVAL OF AN ANNUAL REVIEW FOR SCHAEFER SNOWPLOWING AND GRADING LLC LOCATED IN THE NW ¼ OF SECTION 29 (W195 S9775 RACINE AVENUE / TAX KEY NO. 2274.998) WHEREAS, The Plan Commission approved a Building, Site and Operation Plan for Schaefer Snowplowing and Grading LLC at the property located at W195 S9775 Racine Avenue as per Resolution #P.C. 155-1990, and WHEREAS, The Plan Commission approved an amended Building, Site and Operation Plan for Schaefer Snowplowing Resolution #P.C. 012-2004, and WHEREAS, Conditions of approval included the following: 1. No outside storage of any equipment, LP fuel tanks be located next to the building, and the business be limited to 17 drivers, and 2. Annual Plan Commission review, and WHEREAS, Staff met with Mr. Schaefer in early 2009 to discuss the ongoing cleanup of the site and it was agreed that Mr. Schaefer would begin to remove any storage of vehicles that exist on the east side of the main accessory structure to the southern and western sides of the structure to further reduce outside storage, unless the vehicles are being actively used on that day for business purposes, and WHEREAS, Upon a site inspection on July 27, 2009, Planning Division staff found that many of the past outdoor storage vehicles from the east side of the main accessory structure to be removed. THEREFORE BE IT RESOLVED, That the Plan Commission approves of the Annual Review of the Building, Site and Operation plan for Schaefer Snowplowing and Grading LLC at the property located at W195 S9775 Racine Avenue. BE IT FURTHER RESOLVED, That staff will send a follow-up letter to Mr. Schaefer about the continued screening of outdoor storage of materials and vehicles and that the letter shall address continued removal of outdoor storage items to the south and west of the accessory structure. BE IT FURTHER RESOLVED, That the yearly review be held no later than the second meeting in August of every calendar year. BE IT FURTHER RESOLVED, That failure to comply with the conditions of this Building, Site and Operation Plan shall result in the imposition of fines of $100 per day per violation, the initiation of legal action, or both. Plan Commission City of Muskego Adopted: August 4, 2009 Defeated: Deferred: Introduced: August 4, 2009 ATTEST: Kellie McMullen, Recording Secretary