Loading...
PCR2009032 RESOLUTION #P.C. 032-2009 APPROVAL OF A TWO LOT CERTIFIED SURVEY MAP AND AMENDMENT TO GRADING PLANS FOR THE MUSKEGO COMMERCE CENTER EAST LOCATED IN THE NW ¼ OF SECTION 2 (TAX KEY NOs. 2169.999.003 & 2166.997) WHEREAS, On March 24, 2009 a Certified Survey Map was submitted by Interstate Partners LLC for a two (2) lot land division and grading plan alteration located in the NW ¼ of Section 2 (Tax Key Nos. 2166.997 & 2169.999.001), and WHEREAS, The CSM is establishing the end cul de sac bulb for the Commerce Center east, the outlot for the stormwater improvements for the development, and the eastern most lot for future business development, and WHEREAS, All improvements as required by this CSM (grading, utilities, and roads) will require a Developer’s Agreement and Letter of Credit before the Common Council before any construction begins in this area, and WHEREAS, Commerce Center East construction plans (roads, grading, utilities, etc.) have been approved for Phase 1 in 2008. Phase 1 construction was for the lands west of what is depicted on the CSM, which included the Wal-Mart property, and WHEREAS, As part of the originally approved Commerce Center East improvements, a line of trees was to be left in place behind where Wal-Mart is to be built, and WHEREAS, Wal-Mart currently will have to build a screening wall along the entire rear of their property and behind this wall was to exist a retaining wall and the row of trees that exists today, and WHEREAS, Commerce Center East is proposing that the retaining wall and row of trees be removed, being replaced with simple grading up to the screening wall that would still remain, and WHEREAS, Approximately 50 trees and a variety of shrubs would also be added back to the area, and WHEREAS, The original intent of preserving the tree line behind Wal-Mart was to screen the commercial use in the event that residential lots ended up behind, however, the City has since allowed the lands behind Wal-Mart to be rezoned to Business Park uses and a new, larger screening landscaped berm will be installed further east abutting the Glenbrook Subdivision, and WHEREAS, The City Forester has reviewed the existing tree line and didn’t note that trees would be a loss as the future grading in the area will most likely disturb the trees to the point of failure at some time anyway, and WHEREAS, Said properties are zoned BP-3 Business Park District and the parcels meet said minimum zoning requirements, and WHEREAS, The 2010 Comprehensive Plan depicts this area as business park uses and the proposal is within this goal, and WHEREAS, The Certified Survey Map depicts land dedications for right-of-way in conformity with the 2010 Street System Plan, and WHEREAS, Stormwater will be utilized on Outlot 1, and WHEREAS, The lots will be served with public sanitary system water. THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Certified Survey Map submitted by Interstate Partners LLC for a two (2) lot land division and revised grading plan located in the NW ¼ of Section 2 (Tax Key Nos. 2166.997 & 2169.999.001), subject to resolution of technical discrepancies as identified by the City Engineer, and payment of all applicable fees in Section 18.14(3) of the Land Division Ordinance and outstanding assessments if applicable. BE IT FURTHER RESOLVED, That construction plans are approved by the Public Works and Utilities Committees before the approval of the Certified Survey Map before Council. BE IT FURTHER RESOLVED, That a Developer’s Agreement and Letter of Credit be approved by the Common Council for the public improvements required to support the grading and infrastructure development in this area shown on the Certified Survey Map. BE IT FURTHER RESOLVED, That all technical corrections will need to be addressed before the Certified Survey Map can be signed and recorded. BE IT FURTHER RESOLVED, That a digital file of this CSM shall be submitted to the City in accordance with Common Council Ordinance No. 1118 and Resolution 196-2002. Plan Commission City of Muskego Adopted: April 7, 2009 Defeated: Deferred: Introduced: April 7, 2009 ATTEST: Kellie McMullen, Recording Secretary Page 2