Loading...
CCR2007238. . . COMMON COUNCIL - CITY OF MUSKEGO RESOLUTION #238-2007 DEDICATION OF PUBLIC IMPROVEMENTS WITHIN QUIETWOOD EAST II SUBDIVISION LOCATED EAST OF QUIETWOOD DRIVE AND NORTH OF WOODS ROAD WHEREAS, Quietwood East, LLC hereafter called "DEVELOPER" has constructed the following public improvements: sanitary sewer, water main, storm sewer, curb and gutter and asphalt pavement in Westfield Way and Knollwood Court at the following development: QUIETWOOD EAST II SUBDIVISION BEING A PART OF THE SOUTHWEST 'i:í OF THE NORTHWEST 'i:í AND THE NORTHWEST 'i:í OF THE SOUTHWEST 'i:í OF SECTION 11, TOWN 5 NORTH, RANGE 20 EAST, IN THE CITY OF MUSKEGO, WAUKESHA COUNTY, WISCONSIN and WHEREAS, the DEVELOPER has completed the construction and installation of the following improvements: Sanitary Sewer 821.2 LF at $SO.2S/LF of 8" diameter pvc sanitary sewer pipe 3 EACH at $2S00.00/EACH of 48" diameter concrete sanitary sewer manholes 870 L.F. at $27.S0/L.F. OF 6" diameter pvc sanitary sewer lateral Water Main 839.5LF at $39.00/LF of 8" diameter pvc water main pipe 3 EACH at $800.00/EACH of 8" diameter butterfly valves with valve boxes 2 EACH at $600.00/EACH of 6" diameter butterfly valves on hydrant lead pipe 2 EACH at $ISOO.OO/EACH of fire hydrants 19.4 LF at $30.00/LF of 6" diameter pvc water main lead pipe 17 EACH at $ISO.OO/EACH of 1-1/4" diameter curb valves and valve boxes on service connections 814.3 LF at $20.57/LF of 1-1/4" diameter copper water service pipe Storm Sewer 216.S LF at $36.22/LF of 12" diameter reinforced concrete storm sewer pipe 275.6 LF at $3S.00/LF of IS" diameter reinforced concrete storm sewer pipe 195.6 LF at $37.00/LF of 18" diameter reinforced concrete storm sewer pipe 8 EACH at $146S.00/EACH of20"X36" catch basins 4 EACH at $16S0.00/EACH of 48" diameter concrete storm sewer manholes 930.9 LF at $27.89/LF of6" diameter HDPE sump line . . . Reso. #238-2007 Page 2 and appurtenances (collectively called "IMPROVEMENTS") in accordance with the provision of Chapter 18 of the Municipal Code of the City of Muskego, hereafter called the "CITY" and the City Engineer has certified the systems' acceptability; and WHEREAS, it is the Developer's intent to, without charge to the CITY, unconditionally give, grant, convey and fully dedicate the IMPROVEMENTS to the CITY, free and clear of all encumbrances, and together with mains, conduits, pipes, plants, machinery, equipment and appurtenances which relate directly to the utilization of such utilities; and WHEREAS, the DEVELOPER shall guarantee the public improvements to be dedicated against any defects due to faulty materials or workmanship which appear within a period of one (I) year from the date of dedication and shall pay for any damages resulting therefrom to the CITY property and shall indemnify the CITY against any claims, suits, or liabilities brought against the CITY at any time arising out of the alleged defects or other failure of this guarantee. NOW, THEREFORE, BE IT RESOLVED That the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does hereby accept dedication of the public improvements within Quietwood East II subdivision. DATED THIS 11th DAY of DECEMBER, 2007 SPONSORED BY: FINANCE COMMITTEE Ald. Bob Melcher Ald. Neil Borgman Ald. Keith Wemer This is to certify that this is a true and accurate copy of Resolution #238-2007 which was adopted by the Common Council of the City of Muskego. . . . CITY OF MUSKEGO Staff Report to Finance Committee/Common Council w 1!?~so(,,~iOW1i.:? 3? To: Finance Committee/Common Council EngineerÌnl!..Department, David J. White, P.E., City Engineer"ù~~ Dedication of Improvements for Quietwood East II Subdivision From: Subject: Date: November 30, 2007 Background Quietwood East, LLC developer of Quietwood East II Subdivision has satisfactorily completed all of the required improvements in accordance with their developer's agreement dated April 5, 2005. The required improvements include constructing 902 centerline feet of asphalt street with concrete curb and gutter on Westfield Way and Knollwood Court and constructing storm sewer, sanitary sewer and water main within easements, Westfield Way and Knollwood Court. Attached is the Quietwood East, LLC request to dedicate the required improvements which includes the total quantity and the itemized costs for each of the utility improvements:- Recommendation for Action by Committee: I recommend that both Finance Committee and Common Council accept the dedication of public improvements for Quietwood East II Subdivision. Fiscal Note(s): Total $ Requested: None -. S:\CITYHALL\Engineering\Subdivisions\Quietwood East II\Dedication memo 113007.doc . . . REQUEST FOR CITY OF MUSKEGO APPROVAL OF DEDICATION OF PUBLIC IMPROVEMENTS FOR QUIETWOOD EAST II Quietwood East II, LLC, (Developer) in accordance with the Quietwood East II Development Agreement hereby, without charge to the City of Muskego (City), gives, grants, conveys and fully dedicates to the City on behalf of and for the benefit of the public for public use the public street improvements on Knollwood Court and Westfield Way, and the sanitary sewer, water main and storm sewer facilities, including any and all equipment and appurtenances which may in any way be a part thereof or pertain to, free and clear of all liens and encumbrances in the following quantities: Sanitary Sewer 821.2 L.F. at $50.25/L.F. of 8" diameter pvc sanitary sewer pipe 3 EACH at $2,500/EACH of 48" diameter concrete sanitary sewer manholes 870 L.F. at $27.50/L.F. of 6" diameter pvc sanitary sewer lateral Water Main . 839.5 L.F. at $39.00/L.F. of 8" diameter pvc water main pipe . 3 EACH at $800.00/EACH of 8" diameter butterfly valves with valve boxes . 2 EACH at $600.00/EACH of 6" diameter butterfly valves on hydrant lead pipe . 2 EACH at $1 ,500.00IEACH of fire hydrants . 19.4 L.F. at $30.00/L.F. of 6" diameter pvc water main lead pipe . 17 EACH at $150.00/EACH of 1-1/4" diameter curb valves and valve boxes on service connections. . 814.3 L.F. at $20.57/L.F. of 1-114" diameter copper water service pipe Storm Sewer . 216.5 L.F. at $36.22/L.F. of 12" diameter reinforced concrete storm sewer pipe . 275.6 L.F. at $35.00/L.F. of 15" diameter reinforced concrete storm sewer pipe . 195.6 L.F. at $37.00/L.F. of 18" diameter reinforced concrete storm sewer pipe . 8 EACH of$I,465.00/EACH of20" x 30" catch basins . 4 EACH of $1 ,650.00/EACH of 48" diameter concrete storm sewer manholes . 930.9 L.F. at $27.89/L.F. of 6" diameter HDPE sump line Requested for dedication this ~ day '\)~~~ ~~ ,2007. By D~~ ~~ . DEVELOPER ~ IMuskego City 1392233> 320 Addition No 2-Const Review> Correspondence_AA 120071121-Request for Approval of Dedication of Public Improvements.doc