Loading...
PCR2008036 ./PCR2008036_files/filelist.xml RESOLUTION #PC 036-2008 Print BestFit RESOLUTION #P.C. 036-2008 APPROVAL OF A BUILDING SITE AND OPERATION PLAN AMENDMENT FOR A BACK-UP GENERATOR FOR VERIZON WIRELESS LOCATED IN THE SW ¼ OF SECTION 34 (LOOMIS ROAD – STH 36 / TAX KEY NO. 2295.996.006)   WHEREAS, On February 25, 2008 a Building Site and Operation Plan amendment was submitted by Velocitel, Inc. for Verizon Wireless for the placement of a back-up generator at an existing telecommunications site located in the SW ¼ of Section 34, and   WHEREAS, The petitioner is requesting to place a back-up generator within an existing fenced area near an existing Verizon equipment shelter and tower on the Addis property (along Loomis Road – STH 36), and   WHEREAS, Said property is currently zoned A-1, Agricultural District, and the existing tower and equipment shelter have been previously approved by the Plan Commission, and   WHEREAS, This facility area is already surrounded by a fence and the submittal includes notes that an additional fence with privacy slats will be added around the generator, and   WHEREAS, The location of the proposed back-up generator is located over 170 feet away from Loomis Road (STH 36), and   WHEREAS, The back-up generator would only be used in emergency situations and for testing.   THEREFORE BE IT RESOLVED, That the Plan Commission approves of a Building, Site and Operation Plan amendment submitted by Velocitel, Inc. for Verizon Wireless for the placement of a back-up generator at an existing telecommunications site located in the SW ¼ of Section 34.   BE IT FURTHER RESOLVED, That building permits are still required before the unit can be installed.   BE IT FURTHER RESOLVED, That the fence slatting must be installed around the generator before it is used.   BE IT FURTHER RESOLVED, That a copy of said plans be kept on file in the Building Department and that all aspects of this plan shall be maintained in perpetuity unless otherwise authorized by the Plan Commission.   BE IT FURTHER RESOLVED, That failure to comply with the approval contained in this resolution shall result in the imposition of fines of $100 per day, the initiation of legal action, or both.   Plan Commission City of Muskego   Approved:  April 1, 2008 Denied: Deferred:              Introduced: April 1, 2008 ATTEST:  Kellie Renk, Recording Secretary