Loading...
CCR2006115. , . COMMON COUNCil. CIlY OF MUSKEGO RESOLUTION #1115.~!006 FINAL RESOLUTION AUTHORIZING INSTAllATION OF WATER MAIN IMPROVEMENTS AND lEVYING OF SPECIAL ASSESSMENTS FOR MCSHANE DRIVE FROM DURHAM DRIVE TO FAIRFIELD DRIVE "'fATER PROJECT (Project MlJV.~!~3.Ofi) WHEREAS, the Common Council of the City of ~,l1uskego, Wisconsin, held a public hearing at the City Hall on April 11, 2006 for the purpose of hearing all interested persons concerning the Preliminary Resolution and Fi~eport of the City Engineer on the proposed water main improvement within thE! area de,scribed below and shown on the attached map and heard all persons to speak at the hearing: Water Improvement Assessment Area MCSHANE DRIVE FROM DUFi~HAM DRIVE TO FAIRFIELD DRIVE WATER PHOJECT Project MVI/-33-06 See Attached Legal [)øscription and Map NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Muskego as follows: 1. That the report of the City Engineer anel any amendments or modifications thereto pertainin~~ to the construction of the above-described public improvements, including plans and specifi,cations therefore is adopted and approved. 2. That the City of Muskego has or shall advørtise for bids and shall carry out the improvements in accordance with the mport and any amendments or modifications thereto of the City Engineer. 3. That payment for the improvements bH made by assessing the cost to the property benefited as indicated in tlhe report and any amendments or modifications thereto. 4. That assessments shown on the re'port and any amendments or modifications thereto, representing an exercise of the police power, have been determined on a reasonable basis and are hereby confirmed. . . . Resolution #115-2006 Page 2 5. The assessments shown on the report and the modifications thereto conform with the policies of the City of Muskego now in existence as set forth in Resolution #284..97 and amended in RI9solution #236-98 and Resolution #121- 2000, to the extent not modified by this Resolution. Pursuant to said Policy, the City has determined the method of assessment to be a unit assessment, as set forth in the Engineer's Report referred to tlerein and any amendments or modifications to the same. That the remainder of said assessments are deferred as stated in assessment policies of the City. 6. That the assessments due pursuant to Paragraph 5 of this Resolution may be paid in cash in full on or before November 1,2006 or in ten (10) annual installments of pl"incipal together with twelve (12) months interest per installment to the Clerk-Treasurer, installment payments to bear interest at the rate of 8% per annum on the unpaid balance Gomll1encin!~ on November 1, 2006 and said first installment being due on the date when real estate taxes are due and annually thereof. All assessments or installments which are not paid by the date specified shall be extended upon the tax roll as a delinquent tax against the property and all proceedings in relation to the collection, return and sale of property for delinquent real estate taxE3s shall apply to such special assessment, except as other'vvise provided by statutH. 7. That all deferred assessments shall bE3ar intemst at the rate of 8% per annum on the unpaid balance from November 1 , 2006 and until payment in full. When the deferral of an assessment ends, said assessment shall be paid in cash in full pursuant to the policy of the City set forth lin Resolution #284-97 and amended in Resolution #236..98 and Resolution #121-2000, to the extent not modified by this Resolution, unless the City, at is sole option, negotiates with a property owner having an assessment come due an agreement by which the assessment or a portion thereof may be further deferred when tile Common Council determines that additional deferrals would be just and equitable under the particular circumstances. All assessments or installments which are not paid by the date specified shall bEl extended upon the tax roll as a delinquent tax against the property and all proceedings in relation to the collection, return and sale of property for delinquent real estate taxes sl1all apply to such special assessment, except as othen/vise provided by statute. 8. Interest rates on deferred assessments may bl3 reviewed every five (5) years. 9. That the Clerk-Treasurer shall publish this Resolution as a Class 1 Notice in the assessment district and mail a copy of this Resolution and a statement of the final assessment against the benefitecl property to every property owner whose name appears on the assessment roll whose post office address is known or can with reasonable diligence be ascertainE!d. . . . Resolution #115-2006 Page 3 10. Property owners may be qualified for hardship status which will allow for different payments of the assessment. Property ovvners must apply on or before September 1, 2006 and must be determined to qualify for said hardship status in accordance with the assessment policy SE~t forth in Resolution #284-97 and amended in Resolution #236-98 and R,esolution #121-2000 by October 1, 2006. DATED THIS 23rd DAY OF __.M.~Y ,2006. SPONSORED BY: Mayor Charles Damaske This is to certify that this is a true and accuratø copy of Resolution #115-2006 which was adopted by the Common Council of the City of Muskego. oN Published this 8th day of June, 2006 . . . February 13,2006 EXHIBIT "A" All that part of the Northeast 'l.:í, Southeast .~, and Southwest 'l.:í of Section 12, Town 5 North, Range 20 East, in the City of Muskego, Waukesha County, Wisconsin, bounded and described as follows: Commencing at the Northeast comer of the Southeast 14 of Section 12, said point also being the point ofbeg:lnning oflands to bt~ described; thence Southerly along the East line of the Southeast ~4 of said Section 12, a distance of 1,254.14 feet to the centerline of McShane Drive; thence Southwesterly along said centerline 1256.47 feet to an angle point; thence Northwesterly along said centerline 93.07 feet, to the West extended property line of a parcel ofland identified by Tax..key no. 2208-999-001; thence Southerly along said West line 343.70 feet to the South line of said parcel; thence Easterly along said South line 17.00 feet to the WI;:st line of The Nursery, a Subdivision located in the city of Muskego; thence Southe:rIly along said West line 395.52 feet, to a Northerly line of a parcel ofland identified by Tax-key no. 2207-999; thence Easterly along said North line 1,330.80 feet to the East lim:: of said parcel; thence Southerly along said East line 624.28 feet to the Southerly line of said parcel; thence Westerly along said South line 2,662.22 feet to the West line of the Southeast 1/4 of said Section 12; thence Southerly 13 feet more or less to the Southerly line of 5,aid parcel identified by Tax-key no. 2207-999; thence Westerly along said South line 1,330 feet more or less to the West line of said parcel; thence Northerly along said West line 1,390 feet more or less to the center line of McShane Drive; thence Westerly along said centerline 250 feet more or less to the extended West line of Certified Survey Map No. 3959; thence Northerly along said West line 370 feet more or less, to the NOlth line of said Certified Survey Map; thence Easterly along said North line 202.38 feet to the 'Westerly right-of-way line of Fairfield Drive; thence Northerly along said West line 593 feet more or less to the South line of Certified Survey Map No. 5280; thence \-Vestedy along said South line 185.31 feet, to the West line of said Certified Survey Map; thence Northerly along said West line 260.00 feet to the center line of Courtland Lane; thence Easterly along said center line 1,634 feet more or less to the West line of Lake Brittany Estates Addition No.1 a subdivision located in the City of Muskego; thence Northerly along said West line 356.93 feet to the North line of said subdivision; thence Easterly along said North line 1,328.07 feet, to the East line of said subdivision; thence Southerly along said East line 332.27 feet to the North line of Lake Brittany Estates, a subdivision located in the City of Muskego; thence Easterly along said North line 1,327.51 feet to NOItheast comer of the Southeast 'l.:í of Section 12, and the point of beginning. (See Attached Map) Daniel Flamini, RLS #2486 Page 1 of 1 . . fÐ ..-....... IlIINWDI'Il'" -..... sc.tu;.......... . Assessment District .WU. ..."'''''''''' - ru~..~~_........ MEt..... . . IINSTALLMENT ASSESSMErn NOTICE McShane Drive from Durham Drive to Fairfield Drive Welter Project (Project MVl/-33-06) NOTICE is hereby given that a contract has been let for the installation of water main improvements for McShane Drive frorn Durham Drive to Fairfield Drive, Water Main Project MW-33-06, and that the amount of the special assessment for the improvement has been determined as to each parcel of real estate affected and a statement of the assessment is on file with the City Clerk; it is proposed to collect the special assessment in ten (10) installments, as IProvided for by Section 66.0715 of the Wisconsin Statutes, with interest at eight percent (8%) per year; that all assessments will be collected in installments as proviided above except assessments on property where the owner files with the City Clerk withiin 30 days from date of this notice a written notice that the owner e!lects to pay the special assl3ssment on the owner's property, describing the property, to the City TreasurE~r Oil or before the following November 1, unless the election is revoked. If after makin~1 the el13ction, said property owner fails to make the payment to the City Treasurer, the City Clerk shall place the entire assessment on the following tax roll. Any deferred portion of any assessment is not affected by this Notice. DATED THIS 23rd fv!ID:.____,2006. DAY OF CITY OF MUSKEGO -, Yr~ -1~'- ær@? / Qj)) ~ani(t~ 1V110yer, CMC, ler~,- TrE~asurer ~../ . CilyHalllAssessmenls: McShaneWal'3rProjecUI nslallment NoticI3-MW-:33-06 . . .' (General Obligation Refunding Bonds) Excerpts of Minutes of Opfn Meeting of the Common Council of the City of Muskego A duly-convened meeting of the Common Council of the City of Muskego, Waukesha County, Wisconsin, was held in open session on May 23, 2006, and called to order by the Mayor at 7:30 P.M., Central Time. The following Alderpersons were present: Eileen Madden, Eric Schroeder, Robert Melcher, Nancy Salentine, Neil Borgman, Chris Buckmaster, Tracy Snead The following Alderpersons were absent: None. The Mayor opened the meeting by announcing that this was an open meeting of the Common Council. Notice of this meeting was given to the public at least 24 hours in advance of the meeting by forwarding the complete agenda to the official City newspaper, the Muskego Sun, and to all news media who have requested the same as well as posting. Copies of the complete agenda were available for inspection at the City Clerk's office. Anyone desiring information as to forthcoming meetings should contact the CÜy Clerk's oftïce. (Here occurred business not pertinent to the: bCind authorization.) QBMKE\5897859.1 . EXJIIBITA FINAL REPORT OF THE ENGINEER ON WATER MA.IN IMPROVEMENTS MCSHANE DRIVE FROM DURHAlv1 DRIVE TO FAIRFIELD DRIVE ASSESSMENT DISTRICT "MU" CITY OF MUSKEGO, WISCONSIN In accordance with the Common Council Resolution, this office herewith submits our report on the assessments for the water main improvements in the City of Muskego for purposes of calculating the assessment roll. All of the data shown is based on actual bid project costs. The footages are estimated at the time the drawings were completed, and as such the final project and assessment costs may vary. This report consists of the following scheduh:s: Schedule" 1" .. Summary of assessments and estimate of total project costs. Schedule "2" .. Estimate of assessment for each parcel of property affected . Engineering/Building Inspection City of Muskego W182 S8200 Racine Avenue P,O. Box 749 Muskego, WI 53150 May 14,2006 . 1 S:\CITYHALL\Engineering\Water Projects\McSh~Ule Waler-Lakc: Lore\Engineering Report\FINAL REPORT OF THE ENGINEER51406.doc . 1. Estimated Project Costs ITEM # DESCRIPTION . 1 12" WATEF: MAIN IN SPOIL I BACKFILL 2 12" WATEFt MAIN IN SELECT I BACKFILL 3 8" WATER MAIN IN SPOIL II BACKFill 4 8" WATER MAIN IN SELECT I BACKFILL 5 HYDRANT ASSEMBl Y I 6 6" WATER MAIN IN SPOil I BACKFILL 7 12" BUTTERFLY VALVE I 8 8" BUTTERFLY VALVE I 9 6" BUTTERFl Y VALVE I 10 12" CONNECTION TO EXISTING I MAIN 11 CONNECTION TO EXISTING I MAIN-TUDOR OAKS 12 HYDRANT lEAD I 13 SURFACE RESTORATION 14 WEll NO.1 ABANDONMENT 15 WELL NO.2 ABANDONMENT Total Estimated Construction Costs 20% Administration, Engineering, Contingency Total Estimated Project Cost 2. Estimated Assessable Main Costs . 1 12" WATEH MAIN IN SPOil BACKFill 2 12" WATEH MAIN IN SELECT BACKFILL 3 8" WATER MAIN IN SPOil BACKFill UNIT _.F. QTY. UNIT $ TOTAL _.F. 2766 $67.00 $185,322.00 490 $80.00 $39,200.00 300 $71.00 $21,300.00 120 $83.00 $9,960.00 11-1 8 $2,950.00 $23,600.00 20 $58.00 $1,160.00 H 7 $1,600.00 $11,200.00 1-1 2 $1,100.00 $2,200.00 1-1 2 $900.00 $1,800.00 H 2 $4,000.00 $8,000.00 H 3 $3,700.00 $11,100.00 360 $58.00 $20,880.00 H 1 $20,595.00 $20,595.00 H 1 $4,000.00 $4,000.00 H 1 $31,000.00 $31,000.00 $391.317.00 $78,263.40 $469,580.40 _.F. L.F. EAC L.F. EA.C EAC EA.C EAC EAC L.F. E.A.C EAC EAC L.F. 2766 $67.00 $185,322.00 490 $80.00 $39,200.00 300 $71.00 $21,300.00 L.F. L.F. 2 S:\CITYHALL\Engineering\Water Projects\McShane Water-Lakf: Lore\Engineering Report\FINAL REPORT OF THE ENGINEER51406.doc . 4 8" WATER MAIN IN SELECT BACKFILL 5 HYDRANT ASSEMBLY 6 6" WATER MAIN IN SPOIL BACKFILL 7 12" BUTTERFLY VALVE 8 8" BUTTEEFL Y VALVE 9 6" BUTTEEFL Y VALVE 10 12" CONNECTION TO EXISTINI MAIN 11 CONNECTION TO EXISTING MAIN-TUDOR OAKS 12 HYDRANT LEAD 13 SURFACE RESTORATION 14 WELL NO.1 ABANDONMENT 15 WELL NO.2 ABANDONMENT Total Estimated Construction Costs 20% Administration, Engineering, Contingen< Total Estimated Project Cost . C. Estimated Lateral Costs EAC 3 EAC ;y L.F. 120 $83.00 $9,960.00 H 8 $2,950.00 $23,600.00 20 $58.00 $1,160.00 H 7 $1,600.00 $11,200.00 H 2 $1,100.00 $2,200.00 H 2 $900.00 $1,800.00 H 2 $4,000.00 $8,000.00 H 3 $3,700.00 $11,100.00 360 $58.00 $20,880.00 H 1 $20,595.00 $20,595.00 H 1 $4,000.00 $4,000.00 H 1 $31,000.00 $31,000.00 $391 317.00 $78,263.40 $469,580.40 EAC L.F. EAC EAC EAC L.F. EAC EAC EAC There are no assessable lateral costs associate with this project . 3 S:\CITYHALL\Engineering\Water ProjectsWlcShane Waler-Lake Lore\Engineering Report\FINAL REPORT OF THE ENGINEERS I406.doc . D. Estimated Calculations A. Frontage Assessments Assessments will be calculated on a unit Gount basis, as there is no front foot assessments due based on the acquisition of tile Tudor Oaks/Lake Lore Water Trust B. Water Services Estimated Number of 1 ~ Inch Services o E. Estimated Assessable Costs A. From the Roll dated March 14, 2006 1. Commercial Units . 80 x $1,686.44 $134,915.20 2. Residential Units 134 x $1,686.44 $225,982.96 3. Oversizing Costs 12" verses 8" Main 12" verses 8" fittings $.25.00 x ~1,256 36 e;:Ich x $128.50 ($81,400.00) ( $4,883.00) 4. City Parks Cost ($ 22,400.00) F. Estimated Non-Assessable Costs: Total Estimated Project Costs: Total Estimated Assessable Costs: Total Non-Assessable Costs: $ 469,580.40 $ 360.896.64 $ 108,683.76 . 4 S:\CITYHALL\Engineering\Water Projects\McShane Water-Lakl: Lore\Engineering Report\FINAL REPORT OF THE ENGINEER51406.doc 5/1712~ WATER MAIN AsaMENT PROJECT DRAFT ee10f15 5/1712006. WATER MAIN ASeMENT PROJECT DRAFT .e20f15 5/17120. WATER MAIN ASeMENT PROJECT DRAFT .830f15 5/17/2~ WATER MAIN ASeMENT PROJECT DRAFT ee40f15 5/17/20. WATER MAIN A.MENT PROJECT DRAFT .050f15 5/1712006. WATER MAIN AS.MENT PROJECT DRAFT .860f15 51171200. WATER MAIN A.MENT PROJECT DRAFT eJe70f15 5/17I2we WATER MAIN AaMENT PROJECT DRAFT ej8aOf15 5/17/2~ WATER MAIN ASeMENT PROJECT DRAFT .890115 51171200. WATER MAIN A.MENT PROJECT DRAFT ..100f15 5/171200. WATER MAIN AS.MENT PROJECT DRAFT .110f15 5/171200. WATER MAIN AS.MENT PROJECT DRAFT .120f15 5/17I2we WATER MAIN A6MENT PROJECT DRAFT .130f15 5/171200. WATER MAIN ASeMENT PROJECT DRAFT .140f15 5/171200. WATER MAIN A_MENT PROJECT DRAFT .150f15