Loading...
CCR2005205. . . COMMON COUNCIL - CITY OF MUSKEGO RESOLUTION #205-2005 APPROVAL OF 2006 SEWER UTILITY BUDGET AND RATES BE IT RESOLVED That the Common Council of the City of Muskego, upon the recommendation of the Public Utilities Committee, does hereby approve the attached Sewer Utility Budget for the year 2006. BE IT FURTHER RESOLVED That the Common Council of the City of Muskego, upon the recommendation of the Public Utilities Committee, does hereby establish the following sewer usage rates for 2006: Residential Users: Single Family Home Duplex: 3 Bedroom Unit Duplex: 2 Bedroom Unit Duplex: 1 Bedroom Unit $159.60 per quarter/$638.40 per year $159.60 per quarter $119.70 per quarter $79.80 per quarter Industrial and Commercial Users (Including Multifamily with three or more units): Based on actual metered water use: $5.67 per 1,000 gallons plus a connection charge of $63.08 per quarter, with a minimum charge of $638.40 per year per building. DATED THIS 22nd DAY OF November ,2005 SPONSORED BY: PUBLIC UTILITIES COMMITTEE Ald. Eric Schroeder Ald. Eileen Madden Ald. Patrick Patterson Deferred: 11/08/05 This is to certify that this is a true and accurate copy of Resolution #205-2005 which was adopted by the Common Council of the City of Muskego. 11/05jmb . CITY OF MUSKEGO SEWER UTILITY BUDGET 2006 . . . . . CONTENTS Schedule Paqe Statement of income and expense 1 1-2 Detailed schedule of operating expenses 2 3 Schedule of capital outlay 3 4 Schedule of changes in utility working capital: 2004 Projected 4 5 2005 Budget 5 6 Schedule of construction funds 6 7 Sewer Rate Design 7 8 . CITY OF MUSKEGO SEWER UT. ,J 1. 11/03/05 STATEMENT OF INCOME AND EXPENSE 2006 BUDGET 2005 2006 2006 2004 Aug. 31, 2005 2005 Adopted Proposed Adopted Account Actual Actual Proiected Budaet Budaet Budaet Number Operatina revenues Sewer service charges $ 3,333,039 2,249,895 4,513,810 4,330,821 5,440,486 4801/4810 Miscellaneous revenues 22,824 5,701 7,368 6,100 10,803 4820/4822/4823/4824 Total operating revenues 3,355,863 2,255,596 4,521,178 4,336,921 5,451,289 Operatina expenses Operation and maintenance: Milwaukee Metropolitan Sewerage District: Contract amortization 316,477 316,475 316,477 61.01.6405/6406/6407 Capital charge 1,105,733 2,276,219 2,276,219 2,220,224 2,673,318 61.02.6071 User charge 571,804 303,569 615,000 650,000 627,300 61.03.6072 Town of Norway Capital charge 73,295 73,295 75,000 User charge 282,546 186,242 260,000 341,468 315,000 61.10.6068 Supervision and labor 327,931 205,949 328,924 353,737 377,910 61.11.5101/5102 Supplies and expense 17,915 10,648 21,985 21,985 22,985 Schedule 2 Maintenance: Amortization - Odor control & manhole rehabilitation 44,231 44,231 44,231 44,231 61.16.5428 Odor control 10,518 4,920 21,000 21,000 21,000 61.16.5426 Building and structures 8,601 8,534 10,000 10,000 10,000 61.15.5415 General plant equipment (safety equipment) 2,667 11,245 12,000 10,000 10,000 61.15.5425 Sewerage collection system 77,645 42,495 50,000 50,000 50,000 61.16.5411 I & I reduction 49,110 13,730 40,000 140,000 100,000 61.16.5427 Electricity 82,564 50,033 115,000 115,000 115,000 61.20.5910 Transportation expense 9,053 7,335 9,850 9,850 16,963 61.21.5306 2,906,795 3,120,921 4,193,979 4,377,267 4,458,707 Customers' account expenses: Accounting and collection 52,447 40,690 60,601 60,601 59,014 63.40.5101 Meter expense 26,210 28,000 28,000 28,000 63.40.5101 78,657 40,690 88,601 88,601 87,014 63.40.5101 General expenses: Office salaries 57,472 40,690 60,601 60,601 59,014 63.40.5101 Employees' pensions and benefits 173,472 98,278 168,772 168,771 181,728 63.41.5201/5202/5203/5204/5229/ Unemployment compensation 2,000 2,000 2,000 63.42.6020 Office supplies and expenses 70,169 55,861 102,118 102,118 98,221 Schedule 2 Outside services 114,885 63,163 136,713 130,213 178,882 Schedule 2 415,997 257,992 470,204 463,703 519,846 Total operation and maintenance 3,401,448 3,419,602 4,752,784 4,929,570 5,065,567 Depreciation 913,777 923,796 970,767 958,291 64.50.6705 Total operating expenses 4,315,225 3,419,602 5,676,580 5,900,337 6,023,857 Net operating income (loss) (forward) (959,362) (1,164,006) ( 1,155,402) ( 1 ,563,416) (572,569) . . CITY OF MUSKEGO SEWER UTILITY STATEMENT OF INCOME AND EXPENSE (concluded) 2006 BUDGET 2005 2006 2006 2004 Aug. 31, 2005 2005 Adopted Proposed Adopted Account Actual Actual Proiected Budqet Budqet Budqet Number Net operating income (loss) (forwarded) $ (959,362) (1,164,006) (1,155,402) (1,563,416) (572,569) Add non- operatinq income City subsidies 307,636 617,888 617,888 4950 Interest from investments 151,547 58,587 175,000 200,000 130,000 4531/4910 Interest income on RCA's and special assessments 53,145 16,842 48,629 59,627 52,749 Sewer Connection Fees 89,500 50,000 50,000 50,000 Total non-operating income 601,828 75,428 891,517 927,515 232,749 Income before non-operating expenses (357,534) (1,088,578) (263,884) (635,901 ) (339,820) Deduct non-operatinq expenses Interest charges on long-term debt 447,210 215,168 244,670 430,336 154,997 65.60.7010 Amortization of debt discount 25,473 45,453 23,764 54,544 65.61.7015 Amortization of extraordinary property losses 65.62.6401 Total non-operating expenses 472,683 215,168 290,123 454,100 209,541 Net income (loss) before capital contributions $ (830,217) (1,303,746) (554,007) (1,090,001) (549,361) . Schedule 1 2. . . . Schedule 2 3. 11/03/05 CITY OF MUSKEGO SEWER UTILITY DETAILED SCHEDULE OF OPERATING EXPENSES 2006 BUDGET 2005 2006 2006 2004 Aug. 31,2005 2005 Adopted Proposed Adopted Account Actual Actual Projected Budget Budget Budget Number Operation and maintenance: Supplies and expense: Operating supplies $ 2,173 964 2,485 2,485 2,485 61.12.5702 Chemicals 11,243 9,684 14,000 14,000 14,000 61.12.5750 Water expense 4,500 5,500 5,500 6,500 61.22.5915 $ 17,915 10,648 21,985 21,985 22,985 General expense Office supplies and expenses: Supplies $ 5,240 3,844 5,729 5,729 7,200 63.42.5701 Other general expense 1,186 686 3,000 3,000 3,000 63.42.6056 Telephone and communications 11,186 7,360 20,590 20,590 21,048 63.42.5430/5606 Insurance 46,402 37,860 61,790 61,790 57,132 63.42.610216101/6104 Contingency 67.00.6601 Computer expense 6,155 6,111 11,009 11,009 9,841 63.42.5509 $ 70,169 55,861 102,118 102,118 98,221 Outside services: City administrative charge $ 31,807 23,842 23,842 23,382 63.43.6057 Accounting 20,288 7,000 20,500 20,500 20,500 63.43.5810 Legal 11,361 19,386 40,000 40,000 40,000 63.43.5805 Engineering 15,066 26,236 30,000 30,000 30,000 63.43.5815 Other outside services 33,584 10,541 16,500 10,000 60,000 63.43.5801 Amortization - mapping 63.43.5824 Computer software modification 2,779 5,871 5,871 5,000 63.43.5509 $ 114,885 63,163 136,713 130,213 178,882 . . 11/03/05 CITY OF MUSKEGO SEWER UTILITY SCHEDULE OF CAPITAL OUTLAY 2005 Estimated 2005 2006 2006 Total Adopted Proposed Adopted A/C# Description Cost Budqet Budget Budget 1. 2002 Projects Janesville Box Culvert (A) $ 15,000 134,731 134,110 2. 2004 Projects NW Sewer Study In operations in 2006 1,021 40,879 Facility plan - Muskego share of MMSD (A) 10,000 40,000 2020 Facility plan (A) 5,000 50,000 145,000 Future projects (A) 50,000 50,000 $ 16,021 140,879 235,000 3. 2005 Projects Oversizing on land purchases (A) 10,000 10,000 Truck (A) 18,759 21,000 SCADA Renovations (Radio Study 50%) (A) 11,000 11,000 Woods Rd Forcemain 20" Sandy Beach (E) 1,415,000 1,300,650 Future Projects (A) 50,000 50,000 $ 1,444,759 1,392,650 60,000 4. 2006 Projects Rain gages (A) 16,000 Truck (A) 15,000 SCADA Renovations (A) & (C) 188,000 SCADA software and hardware programing (A) 55,000 Variable frequency drive for Woods Road (D) 13,000 Future Projects $ 287,000 Totals $ 1,475,780 1,668,260 716,110 Note A: Anticipated to be financed with available construction funds Note B: Anticipated to be financed with 2005 borrowing Note C: Finance with working capital Note 0: Finance with replacement funds Note E: Finance with reserve capacity assessment funds . Schedule 3 4. . CITY O.SKEGO SEWER UTILITY ~ 5. 11/03/05 SCHEDULE OF CHANGES IN UTILITY WORKING CAPITAL 2005 PROJECTED 2005 Projected NON TIF Operation Reserve and Special Equipment Capacity Maintenance Redemption Replacement Assessment Construction 2005 Fund Fund Fund Fund Fund Total Budaet Funds provided From operations: Net income (loss) for the year $ (554,007) (554,007) (1,090,002) Add charges to income not requiring funds: Depreciation 923,796 923,796 970,767 Amortization: MMSD contract 316,475 316,475 316,477 Debt discount 45,453 45,453 23,764 Manhole Rehabilitation 44,231 44,231 44,231 Less: Other Funds provided from operations 775,948 775,948 265,237 Increases in: Collection of special assessments 57,244 503,610 560,854 374,744 Refunding debt issued 4,225,000 Other contributed capital collections Total funds provided 833,192 4,225,000 503,610 5,561,802 639,981 Funds applied Principal payments on debt 4,430,000 4,225,000 8,655,000 590,000 Debt discount and issue costs 89,143 89,143 Capital outlay (Schedule 6) 1,475,780 1,475,780 1,618,260 Total funds applied 4,430,000 4,314,143 1,475,780 10,219,923 2,208,260 Interfund transfers - net Interest earnings (94,500) 13,000 66,500 15,000 Equipment replacement (26,350) 26,350 Sewer Connection fees (50,000) 50,000 Funds used for debt retirement 931,430 (931,430) RCA funds used to finance capital outlays (1,415,000) 1,415,000 RCA funds used to finance MMSD capital charge 520,222 (520,222) Total transfers 1,280,802 (931,430) 39,350 (1,818,722) 1,430,000 Increase (decrease) in working capital (2,316,007) (1,020,573) 39,350 (1,315,112) (45,780) (4,658,121 ) (1,568,279) Workina capital. beainnina of vear 7,218,293 1,512,009 530,101 3,424,465 717,894 13,402,762 13,249,378 Workina capital. end of vear i 4,902,286 491,436 569,451 2,109,354 672,114 8,744,641 11,681,099 2004 Budgeted Working Capital, end of year $ 6,083,233 1,536,622 566,854 3,101,176 393,214 11,681,099 . . Schedule 5 . 6. 11/03105 CITYOF MUSKEGO SEWER UTILITY SCHEDULE OF CHANGES IN UTILITY WORKING CAP IT AL 2006 BUDGET NON TIF Operation Reserve and Special Equipment Capacity Maintenance Redemption Replacement Assessment Construction Fund Fund Fund Fund Fund Total Funds provided From operations: Net income (loss) for the year $ (549,361) (549,361 ) Add charges to income not requiring funds: Depreciation 958,291 958,291 Amortization: MMSD contract Debt discount 54,544 54,544 Manhole Rehabilitation and Mapping Projects 44,231 44,231 Less: Proceeds from long-term debt Other Funds provided from operations 507,705 507,705 Increases in: Collection of special assessments 66,474 430,293 496,767 Other contributed capital collections Total funds provided 574,179 430,293 1,004,472 Funds applied Principal payments on debt 75,000 75,000 Capital outlay (Schedule 6 for Construction Fund) 716,110 716,110 Total funds applied 75,000 716,110 791,110 Interfund transfers - net Interest earnings (78,000) 15,000 53,000 10,000 Equipment replacement (26,350) 26,350 Use Equipment replacement (13,OOO) 13,000 Sewer Connection fees (50,OOO) 50,000 Transfer to Construction Fund (20,996) 20,996 Transfer for debt retirement reserve (117,083) 117,083 RCA funds used to finance MMSD capital charge 668,330 (668,330) Total transfers 375,900 117,083 28,350 (565,330) 43,996 Increase (decrease) in working capital 875,079 117,083 28,350 (135,037) (672,114) 213,362 Workina capital. beainnina of year 4,902,286 491,436 569,451 2,109,354 672,114 8,744,641 Workina capital, end of year $ 5,777,366 608,519 597,801 1,974,317 8,958,003 $260K due 5/1/06P I Reserve 173,333 26,051 409,135 608,519 . . Schedule 6 . 7. 11/03/05 SCHEDULE OF CONSTRUCTION FUNDS PROJECTED 2005 AND 2006 Actual 2005 Projected 2006 Projected Balance Projected Balance Projected Balance Project 12/31/2004 Revenues Costs Transfers 12/31/2005 Revenues Costs Transfers 12/31/2006 Debt issue and working capital funds: Janesville Road Box Culvert 134,731 15,000 119,731 134,110 14,379 Oversizing on land purchase 10,000 10,000 10,000 Truck 21,000 18,759 2,241 15,000 12,759 NW Sewer Study 40,879 1,021 (39,858) 2020 Facility plan 50,000 5,000 45,000 145,000 100,000 Facility plan - Muskego share of MMSD 10,000 10,000 40,000 40,000 SCADA Renovation (Radio Study) 11,000 11,000 Woods Rd Forcemain 20" Sandy Beach 1,415,000 1,415,000 Future projects 100,000 100,000 100,000 Rain gages 16,000 16,000 SCADA Renovations 188,000 188,000 SCADA software and hardware programing 55,000 55,000 Variable frequency drive for Mc Shane 13,000 13,000 Transfer from replacement funds 13,000 (13,000) Transfer from working capital funds 20,996 (20,996) Transfer from reserve capacity assessment funds 1,415,000 (1,415,000) Unallocated debt proceeds and interest earnings 350,284 15,000 29,858 395,142 10,000 (405,142) TOTAL $ 717,894 1,430,000 1,475,780 672,114 43,996 716,110 . . . City of Muskego Sewer Rate Design 2006 Budget 1. Estimated Reyenue Reauirement (Based on the year 2006 Budaetl Aocmons: Operation and maintenance expenses Depreciation Replacement Fund - DNR requirement Mortgage Revenue Bond compliance requirements Rate of return of average investment rate base - ( Exhibit C 1.) RCA funds used Gross revenue requirement Rate Stabilization component - use of interest income, other income and operating reserves Net Revenue Requirement per Budget 2. Estimated number of aallons (0001 billed 3. Number of laterals .lconnectlonsl 4. Estimated annual number of aallons used by a ayeraae residential customer 5 Inflow Ilnflltration based on an eiaht year ayeraae proylded by Ruekert & Mielke. Inc. 6. Rate components Type of Charae Model Formula Connection Charge Net Revenue Reauirement X Inflow and infiltration % Number of laterals Consumption Charge Net Revenue Reauirement X Billable % Number of gallons (000) billed Computation Connection Charge $ 5,410,485.87 X 7,128 34.46% Consumption Charge $ 5,410.485.87 X 598,390 65.54% 7. Ayeraae annual residential charae Estimated number of gallons used by a average residential customer per year Consumption charge per 1,000 gallons Average residential annual consumption charge Average residential annual connection charge Total average residential annual sewer usage charge (A) Use of Fund balance per MRB test Interest income Penalties and other income Additional use of fund balance 130,000 40,802 197,308 368110 (AI Schedule 7 8 Data $ 5,065,567 958,291 26,350 396,718 6,446,925 (668,330) 5,778,596 (368,110) (AI $ 5,410,486 598,390 7,128 63,539 ~ ::: connection Charge = Consumption Charge $261.58 Connection Charge ~ Consumption Charge 63,539 ~ $376.53 $261.58 $638.11 Use of Fund balance per MRB test Interest income Penalties and other inoome Use of fund balance to partially finance depreciation (A) 130,000 40,802 197,308 368,110