Loading...
CCR2005020. . . COMMON COUNCIL - CITY OF MUSKEGO RESOLUTION #020-2005 APPROVAL OF FEE SCHEDULE FOR DEPARTMENT OF PUBLIC WORKS WHEREAS, It was determined by the Public Works Committee that fees for work performed by the Department of Public Works be increased as reflected on the attached schedule; and WHEREAS, Chapter 8 of the Municipal Code provides that fees referred to in said chapter shall be from time to time established by Resolution of the Common Council. NOW, THEREFORE, BE IT RESOLVED that the Common Council of the City of Muskego, upon the recommendation of the Public Works Committee, does hereby approve the attached Fee Schedule for the Department of Public Works effective immediately. DATED THIS 25th DAY OF Januarv ,2005 SPONSORED BY: PUBLIC WORKS COMMITTEE Ald. Chris Buckmaster Ald. Nancy Salentine Ald. Neil Borgman This is to certify that this is a true and accurate copy of Resolution #020-2005 which was adopted by the Common Council of the City of Muskego. 1/2005jmb '... . . . FEE SCHEDULE DEPARTMENT OF PUBLIC WORKS WORK PERFORMED 1999 RATE 2000 RATE 2003 RATE 2005 RATE Lot Mowing $ 57.60/hr. $ 60.00/hr. $ 70.00/hr. $ 75.00/hr Snow plowing/Private Drives $ 50AO/hr. $ 54.00/hr. $ 65.00/hr. $ 70.00/hr Culvert Reset in Private Drives $250.00 $ 275.00 $ 300.00 $ 400.00/hr Grading/Private Drives $ 45.00/hr. $ 52.00/hr. $ 65.00/hr. $ 70.00/hr. New Culverts 12" X 20' $525.60 $ 565.00 $ 600.00 $ 625.00 Additional footage $ 19.08/ft. $ 20.00 $ 26.00 $ 30.00/ft Culvert band $ 8.13/ea. $ 9.00 $ 14.00 $ 18.00 15" X 20' $576.00 $ 615.00 $ 650.00 $ 675.00 Additional footage $ 21.60/ft. $ 22.00 $ 30.00 $ 34.00 Culvert band $ 10.02/ea. $ 10.50 $ 15.00 $ 20.00 18" X 20' $633.60 $ 675.00 $ 715.00 $ 745.00 Additional footage $ 24A8/ft. $ 25.00 $ 34.00 $ 38.00/ft. Culvert band $ 11.94/ea. $ 12.50 $ 18.00 $ 26. OO/ft. 21" X 20' $699.60 $ 750.00 $ 800.00 $ 825.00 Additional footage $ 27.78/ft. $ 28.50 $ 36.00 $ 40.00/ft. Culvert band $ 13.89/ea. $ 14.50 $ 21.00 $ 28.00 24" X 20' $775.00 $ 825.00 $ 900.00 $ 930.00 Additional footage $ 31.55/ft. $ 32.50 $ 38.00 $ 41.00/ft. Culvert band $ 15.81/ea. $ 16.50 $ 24.00 $ 30.00 . . . WORK PERFORMED 1999 RATE 2000 RATE 2003 RATE 2005 RATE Concrete Inverts 5" X 2' X l' $ 6.48/ft. $ 9.50/ft. $ 10.00/ft. $ 15.50/ft. 5" X 3' X l' $ 8.64/ft. $ 11.80/ft. $ 12.20/ft. $ 20.00/ft. 5" X 4' X l' $ 10.08/ft. $ 13.25/ft. $ 15.00/ft. $ 25.00/ft. Road Opening Permits (1/2 of road width not to exceed 36" in width) $576.00 $ 615.00 $ 700.00 $ 750.00 (entire road width not to exceed 36" in width) $864.00 $ 925.00 $1000.00 $ 1100.00 4" Pipe $ 3.60 $ 4.25 $ 5.00 Dual 4" Pipe $ 4.50 $ 5.50 $ 6.25 Greater than 36" wide or any unforeseen damages billed at the discretion of the Public Works Superintendent Ditch Bonds - Deposit $ 288.00 $ 315.00 $ 345.00 $ 345.00 - Inspection Fee $ 36.00 $ 40.00 $ 45.00 $ 50.00 Curb/Gutter Restoration - Deposit $ 288.00 $ 315.00 $ 345.00 $ 345.00 - Inspection Fee $ 36.00 $ 40.00 $ 45.00 $ 50.00 Endwalls Installed $ 144.00 $ 165.00 $ 225.00 $ 300.00 Labor $ 24.00/hr. $ 27.00/hr. $ 30.00/hr. $ 32.00/hr. Cruz Aire $ 60.00/hr. $ 85.00/hr. $ 85.00/hr. $ gO.OO/hr. "I . . WORK PERFORMED 1999 RATE 2000 RATE 2003 RATE 2005 RATE Patrol/Dump Truck $ 40.00/hr. $ 65.00/hr. $ 65.00/hr. $ 85.00/hr. Camera Truck $ 75.00/hr. $ 78.00/hr. Vactor $ 85.00/hr $ gO.OO/hr. Cityhali/Engineering/Public Works/DPW Fees .