Loading...
CCR2000194COMMON COUNCIL - CITY OF MUSKEG0 RESOLUTION #194-2000 RELEASE OF EASEMENT Malioowski WHEREAS, The Finance Committee has reviewed a request to release an easement on the Malinowski property and has recommended approval. NOW, THEREFORE, BE IT RESOLVED that the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does hereby approve the attached Release of Easement for the Malinowski property. BE IT FURTHER RESOLVED That the Mayor and Clerk-Treasurer are authorized to sign the Release in the name of the City. DATED THIS 26th DAY OF September 2000. SPONSORED BY: FINANCE COMMITTEE Ald. Mark Slocornb Ald. David J. Sanders Ald. Nancy C. Salentine This is to certify that this is a true and accurate copy of Resolution #194-2000 which was adopted by the Common Council of the City of Muskego. 1 ClerMreasurer 9i00jmb v Document Number RELEASE OF EASEMENT THE UNDERSIGNED as owner of lhe following described red esmle in WauLCsha cnurlly. stale Of Wiswmiu: Parcels One (I) and Two (2) of Certified Map No. 8888, recorded in Volume 79 of Certified Survey Maps at pages 193 through 196 as Document No. 2523700 being a part ofthe Southwest 114 ofthe the city ofMuskego, Waukesha County, Wisconsin Northeast 114 of Section I I, Township 5 North, Range20 East in designated on said Certified Survey Map as "Common Drive hereby releases, relinquishes and extinguishes the easement Easement" intending hereby that a common driveway right is not granted to the owner of Parcel 2 of said Certified Survey Map. L Parcel Ldrnifiution Nmkr mW, This h nM bomCNId prapcw The signatures of the Mayor and Clerk of the City of Muskego are shown hereon to indicate that said City consents to the release ofthe aforesaid easement. Mayor. Ciry of Muskego AUTAEWICATION Clerk. Ciry of Muhgo ACKNOWLEDGMENT THls MSTRUMPNT WAS DUFED BY George T. Weber CERNFlEO SURVEY MAP NO. BUNG 4 REDIVISION OF PARCEL I OF C.S.M. NO, 2113, RECOROEO AS OOCUHENT NO. 888192. AN0 UNPLATTEO L ANOS IN THE sw I/# F THE NE 1/4 F SECTION ti, WWN 5 NOR7H RAllGP PO EASI; IN %E CITY OF MUSKEGO, WAUkEStlA COUNTY, WISCONSIN i SHEET IOF4 JOB NO, 27214 CITY OF MUSKEGO, SCHEDULE OF BUILDING PERMIT FEES TABLE #I Page 1 A. Residential 1 8 2 family 8 attached garages, new const. and additions, (see F. for alterations). B. Apartments 3 family and over, row houses, other other multifamily dwellings and institutional buildings with attached garages, new const. and additions, (see F. for alterations). C. Local business, commercial buildings, retail stores, office buildings, hotels, restaurants, etc., new const. and additions, (see F. for alterations). D. Manufacturing facilities, industrial factories, warehouses, new const. and additions, (OFFICES per C.), (see F. for alterations, EXCEPT OFFICE AREAS). E. Detached garages and other accessory structures, new construction or additions, (see F. for alterations). F. Alterations, repairs, residing, re-roofing or other work where sq. ft. cannot be calculated. Re-roofing $250.00 maximum per bldg. G. Foundation early start permit: (REQUIRES FINANCE COMMITTEE OR PUBLIC SAFETY APPROVAL) 1.) Multifamily/commercial/industrial 2.) 1 8 2 Family dwellings H. Heating units, incinerators, fireplaces and other wood burning appliances: 1.) First 150,000 BTUs a.) Each additional 50,000 BTUslfraction $750.00 maximum per unit. 1. Air conditioning: 1.) First 36,000 BTUs or 3 TONS a.) Each additional 12,000 BTUs, 1 TON or fraction, $750.00 maximum per unit. J. HVAC distribution systems: 1.) Each 100 sq. ft. of temperature controlled area, (minimum $25) K. Exhaust hoods and similar systems, comm. or ind. L. Wrecking or razing: 0 (fee may be waived if structure subject to condemnation) 1 .) Base fee a.) Then add sq. ft. charge (total area) NOTE: Fee not to exceed $250 maximum per bldg. $ .20 sq.ft. .20 sq.ft. .16 sq.ft. .10 sq.ft. .10 sq.ft. 7.00 /$lOOO 200.00 ea. 100.00 ea. 30.00 ea. 10.00 ea. 30.00 ea. 10.00 ea. 1.00 ea. 50.00 ea. 30.00 ea. -02 ea. TABLE #1 Page 2 CITY OF MUSKEGO, SCHEDULE OF BUILDING PERMIT FEES M. Moving building over public ways: I.) Principal bldg. base fee 2.) Accessory bldg. base fee 0 a.) Then add sq. ft. charge (total area) a.) Then add sq. ft. charge (total area) N. Fuel tanks, remove or install, (registration only) 0. Plan examination: 1 .) 1 8 2 family new const. (includes living areas all levels 8 garage) a.) Base fee per building 2.) 3 family and over new const. a.) Base fee per building b.) Then add per dwelling unit 3.) Residential additions or alterations 4.) Accessory or agricultural over 240 sq. R. 5.) Commercial, industrial: a.) New construction b.) Additions c.) Alterations over 1500 sq. ft. d.) Alterations under 1500 sq. ft. 6.) HVAC plans, commercial, industrial 7.) Decks (over 240 sq. ft.), swim pools 8.) Fire Department Review (All Commercial) Fire Department Review (Sprinkler system with 50 heads or more) (Sprinkler system with less than 50 heads) (Fire and Smoke Detection Systems) Fire Department Review P. Wisconsin Uniform Permit seals Q. House numbers: 1.) Complete set 2.) Each individual letter 3.) Each frame (regardless of size) R. Occupancy permit: I.) Residential (per unit) 2.) Commercial, industrial, business S. Pools, above ground, in ground, spas, hot tubs ($30 minimum even if combined with deck) T. Decks U. Signs billed each sq. ft. face, (inc. base if new construction) 50.00 ea. .03 ea. 5.00 ea. .03 ea. 30.00 ea. 75.00 ea. 75.00 ea. 20.00 ea. 40.00 ea. 20.00 ea. 150.00 ea. 100.00 ea. 100.00 ea. 50.00 ea. 30.00 ea. 20.00 ea. 60.00 ea. 60.00 ea. 30.00 ea. 30.00 ea. 30.00 ea. 15.00 ea. 1.15 ea. 1.93 ea. 30.00 ea. 75.00 ea. 7.00/$1000 30.00 ea. 1.00 ea. TABLE #1 Page 3 CITY OF MUSKEGO, SCHEDULE OF BUILDING PERMIT FEES IO V. Erosion ControllLand Disturbing Fees: 0 I.) I 8 2 family lots 2.) 3 family and over a.) Base fee per building b.) Then add per I000 sq. ft. of disturbed lot area. $2,000.00 maximum per building. 3.) Commercial, industrial, institutional 100.00 ea. 150.00 ea. ~.OO/IOCI a.) Base fee per building b.) Then add per 1000 sq. ft. of disturbed lot area. $2,000.00 maximum per building. 4.) Land disturbing permit (no const.) a.) Base fee b.) Then add for each acre over 4 acres 5.) Utility installations (annual permit) 6.) Other misc. small projects Va. Erosion ControllDeposits: I.) One/two Family (one acre and less) 2.) One/two Family (greater than one acre) 3.) Multi-Family 4.) Commercial Business e W. Permit reimbursement fee (no money refunded if any inspections made) X. *Failure to call for inspection Y. Inspections outside of normal hourslworkdays Ya. Re-inspection (after I follow-up) Yb. Minimum charge for any one permit Yc. ** Penalty fees 150.00 ea. 5.00 ea. 100.00 ea. 6.00 ea. 200.00 ea. 30.00 ea. 500.00 ea. 600.00 ea. 750.00 ea. Not Less than 1,000.00 ea. 30.00 ea. 50.00 ea. 100.00 ea. 30.00 ea. 30.00 ea. *** ea. * FAILURE TO CALL FOR INSPECTION: An additional fee shall be assessed, as listed in the table above, when work covered, or new installation utilized prior to approved inspection. ** PENALTY FEES: A penalty, which amount shall equal three (3) times the applicable permit fee (min. $go), shall be paid when work is started prior to permit being issued.