Loading...
CCR1994083COMMON COUNCIL - CITY OF MUSKEGO RESOLUTION #83-94 RESOLUTION TO ESTABLISH FEES (Building Code Permit and Penalty Fees) (Required Uniform House Numbers) WHEREAS, Chapter 30, Sections 30.05(8), 30.09(l)(f), and 30.50 of penalty fees be as from time to time established by Resolution of the Municipal Code, provides that various building code permit and the Common Council; and WHEREAS, Chapter 8, Section 8.03(9)(c) of the Municipal Code provides that the fee for required uniform house numbers be as from time to time established by Resolution of the Common Council; and WHEREAS, the Finance Committee has recommended that the fees for Building Permits listed on Table #1, as attached, be approved. NOW, THEREFORE, BE IT RESOLVED, that the Common Council of the City of Muskego, upon the recommendation of the Finance Committee, does uniform house numbers as listed on Table #1, as attached, effective hereby establish building code permit and penalty fees and fee for upon passage and publication of Ordinances #E35 and #838. DATED THIS 12TH DAY OF APRIL , 1994. SPONSORED BY: FINANCE COMMITTEE Ald. Patrick A. Patterson Ald. Edwin P. Dumke Ald. David J. Sanders This is to certify that this is a true and accurate copy of Resolution #83-94 which was adopted by the Common Council of the City of Muskego. 4/94jmb TABLE #1 page 1 CITY OF MUSKEGO, SCHEDULE OF BUILDING PERMIT FEES (adopted - - 1994) 0 A. B. C. D D. I E. F. 6' H I. J. K. L. Residential 1 & 2 family €i attached garages, $ .13 sq.ft. new Const. and additions, (see F. for alterations). Apartments 3 family and over, row houses, buildings with attached garages, new const. and other multi family dwellings and institutional additions, (see F. for alterations). 13 sq.ft. Local business, commercial buildings, retail stores, office buildings, hotels, restaurants, etc., new const. and additions, (see F. for alterations). Manufacturing facilities, industrial factories, warehouses, new const. and additions, (OFFICES per. C.), (see F. for alterations, EXCEPT OFFICE AREAS). Agricultural buildings, detached garages and other .08 sq.ft. accessory structures, new const. or additions; (see F. for alterations). Alterations, repairs, residing, re-roofing or other 6.50 /$lo00 work where sq.ftg. cannot be calculated. Foundation early start permit: (REQUIRES FINANCE COMMITTEE OR PUBLIC SAFETY APPROVAL) .15 sq.ft. .09 sq.ft. 1.) Multi farnily/commercial/industrial 200.00 ea. 2.) 1 & 2 Family dwellings 100.00 ea. Heating units, incinerators, fireplaces and other woodburning appliances: 1.) First 150,000 BTUs a,) Each additional 50,000 BTUs / fractn 4.00 ea. 30.00 ea. Air conditioning: 1.) First 36,000 BTUs or 3 TONS or fraction a.) Each additional 12,000 BTUs, 1 TON 30.00 ea. 4.00 ea. WAC distribution systems: 1.) Each 100 sq.ft. of temperature controlled area, (minimum $15) 1.00 ea. Exhaust hoods and similar systems, comm or industrial 30.00 ea. Wrecking or razing: (fee may be waived if structure subject to condemnation) 1.) Base fee a,) Then add sq.ftg. charge (total area) .02 ea. 30.00 ea. N0TE:Fee not to exceed $250 maximum per bldg Moving building over public ways: 1.) Principal bldg base fee 50.00 ea. a.) Then add sq.ftg. charge (total area) .03 ea. 2.) Accessory bldg base fee 5.00 ea. a ) Then add sq. ftg. charge (total area) .03 ea. TABLE #1 page 2 continued CITY OF MUSKEGO, SCHEDULE OF BUILDING PERMIT FEES (adopted - - 1994) 0 N. 0. P. Q. 0 R. S T. U. V. W. a Fuel tanks, remove or install, (registration only) Code compliance inspections (1 followup insp. inc.) 30.00 ea. 65.00 ea. Plan examination: 1.) 1 & 2 family new const (includes living areas all levels & garage) a.) Base fee per building 75.00 ea. a. ) Base fee per building 75.00 ea. b.) Then add per dwelling unit 20.00 ea. 2.) 3 family and over new const 3.) Residential additions or alterations 40.00 ea 4.) Accessory or agricultural over 240 sq.ft. 20.00 ea 5. ) Commercial, industrial : a.) New construction 150.00 ea. b.) Additions 100.00 ea. c.) Alterations over 1500 sq.ft. 100.00 ea. d.) Alterations under 1500 sq.ft. 50.00 ea 6.) WAC plans, commercial, industrial 30 00 ea. 7.) Decks (over 240 sq.ft.) , swim pools 20.00 ea. Wisconsin Uniform Permit seals 30.00 ea. House numbers: 2.) Each individual letter 1. ) Complete set 3.) Each frame (regardless of size) 15.00 ea. 1.15 ea. 1.93 ea. Occupancy permit: 1.) Residential (per unit) 30.00 ea. 2.) Commercial, industrial, business 75.00 ea. Pools, above ground, in ground, spas, hot tubs ($30 minimum even if combined with deck) 6 50 /$lo00 Decks 30.00 ea Signs billed each sq.ft. face, (inc. base if new const.) 1.00 ea. Erosion control: 1.) 1 & 2 family lots 2.) 3 family and over b.) Then add per 1000 sq.ft. of a.) Base fee per building. 3.) Commercial, industrial, institutional. a,) Base fee per building. b.) Then add per 1000 sq.ft. of disturbed lot area. disturbed lot area. 4.) Land disturbing permit (no const.) b.) Then add for each acre over 4 acres a.) Base fee. 5.) Utility installations (annual permit) 6.) Other misc. small projects. 75.00 ea 75.00 ea. 5.00 /lo00 150.00 ea. 5.00 ea. 75.00 ea. 6.00 ea. 200.00 ea. 30.00 ea. TABLE #1 page 3 continued CITY OF MUSKEGO, SCHEDULE OF BUILDING PERMIT FEES (adopted - - 1994) a. Permit reimbursement fee 30.00 ea (no monies refunded if any inspections made) Y. + Failure to call for inspection 50.00 ea. Z. Za Zb zc D * 1 ** Inspections outside of normal hours/ workdays 100.00 ea. Re-inspection (after 1 followup) 30.00 ea. Minimum charge for any one permit 30.00 ea. ++ Penalty fees **.++ ea. FAILURE TO CALL FOR INSPECTION: An additional fee shall be assessed, as listed in the table above, when work covered, or new installation utilized prior to approved inspection. PENALTY FEES: A penalty, which amount shall equal three (3) times the applicable permit fee (min $go), shall be paid when work is started prior to permit being issued.