Loading...
CCR1994040COMMON COUNCIL - CITY OF MUSKEG0 RESOLUTION #40-94 AWARD OF BID Variable Frequency Drive Replacement McShane Road Lift Station WHEREAS, the City advertised for bids for the Variable Frequency Drive Replacement at the McShane Road Lift Station, and the following bids were received: Base Bid Deducts Net Bid Venture Electrical Contractors $82,890.00 $(28,533) $54,357 PieDer Power 93,688.00 (11,552) 82,136 - Perigon Systems, Inc. NSI Electrical Contractors Habermehl Electric B. H. Barg Electric 62,245.00 62,245 92,100.00 (17,475) 74,625 79,682.00 (18,868) 60,814 (24,000) 60,497 (23,800) 60,697 84,497.00 (16,000) 68,497 WHEREAS, the City engineers and the Public Utilities Committee have recommended approval of the low bid from Venture Electrical Contractors material substitutions as outlined in the bid specifications and in the amount of $82,890.00 minus $28,533 for deductions for Attorney. approved by Owner for a net cost of $54,357 subject to review by City NOW, THEREFORE, BE IT RESOLVED that the Common Council of the City of uskego, upon the recommendation of the City Engineers and the Public tilities Committee, does hereby accept the low bid from Venture clc: Electrical Contractors in the net amount of $54,357 for the Variable Frequency Drive Replacement at the McShane Road Lift Station subject to review by City Attorney. BE IT FURTHER RESOLVED that the Mayor and Clerk are hereby authorized to sign the necessary documents in the name of the City, and are recommendation of the City Engineers. further authorized to sign any change orders at their discretion upon DATED THIS 22ND DAY OF FEBRUARY , 1994. SPONSORED BY: PUBLIC UTILITIES COMMITTEE Ald. David J. Sanders Ald. William H. Schneider Ald. Donna M. Woodard This is to certify that this is a true and accurate copy of Resolution #40-94 which was adopted by the Common Council of the City of Muskego. 2/94 jmb