Loading...
CCR1989198COMMON COUNCIL - CITY OF MUSKEG0 RESOLUTION #198-89 RESOLUTION AS TO GUIDELINES FOR PROCEDURES FOR THE APPLICATION OF WASTEWATER RESIDUE ON AGRICULTURAL LANDS WHEREAS, Resolution 11122-76 adopted guidelines for procedures for the application of wastewater residue on agricultural lands, and WHEREAS, the Public Welfare Committee has recommended a change in the permit fee. NOW, THEREFOKE, BE IT KESULVED that the Common Council of the City of Muskego, upon the recommendation of the Public Welfare Committee, does hereby amend 7. of the guidelines for procedures for the application of wastewater residue on agricultural lands to read as follows: 7. There shall be a $100.00 permit fee plus $5.00 per acre. DATED THIS 25th DAY OF .~~~l~ , 1989. PUBLIC WELFARE COMMITTEE Ald. Patrick A. Patterson Ald. William T. Simmons Ald. Edwin P. Dumke ATTEST : City Clerk 7 189 jz / CITY OF MUSKEG0 ,. APPLICKEION OF WASTEWATER KESIDdE RECOMNENDED PROCEDURES FOR THE The following procedures are recommended for the application of of soil putrification. severage sludge to sites In the City of Muskego Eor the purpose 1. The contractor shall review the site as its suitability to all DNR requirements including, but not limited to the follovlng: e) Drainage including adjacent water courses. b) Surface slopes of the site. c) Location of existing dwellings and location of public and private wells adjacent to the site. d) Soil suitabllity for uptake oE sewerage sludge including required nutriflcation. e) Existence of high ground water or high bed rock. 2. The contractor shall provide the necessary informatlon to UNR in order for the DNR to evaluate the necessary measures to prevent trucking of sludge and/or mud on public streets. 3. The contractor shall haul the sludge to the site in a closed tank truck and shall take the necessary measures to prevent trucking of sludge and/or mud on public streets. 4. The contractor shall apply the severage sludge to the sol1 by one of the following methods: a) Hydraulically injecting the sludge into the soil. ellminate sludge on the surface. Injection procedure should be controlled in order to b) Surface spreadtng of the sLudge on the soil. lf surface spreading is used, the site must be turned over immediately after spreadlng. Note: immediately means that no sludge shall remaln on the soil for more than one hour prior to turning the soil over. 5. Prior to the contractor applying the sludge to the site, the contractor shall provide the follovlng Lnformatlon to the Planning and Development Department: a) Name and address of contractor. b) Name and address of site ovner. c) Location of site. d) Size of site. e) The date or dates the site vi11 be used for sludge application. f) Method of sludge application. g) Application rate to be used and lf this rate has been approved by the ONR. h) Confirm that the site has been approved by DNR giving name of DNR staff granting approval. 6. Permlt vilL be llmlted to a one (1) year period. 7. There shall be a $25.00 minimum permit fee. MCC: M-S ludgeAp 8. Each permit shall require Common Council approval. - ... .