Loading...
CCR1986167APPROVAL TO AMEND CONTRACT WITH SUPER EXCAVATORS FOR SURFACING WOODS ROAD (Ladwig Drive Sewer Project) WHEREAS, Resolution #207-85 (As Amended) Awarded the Bid for the Ladwig Drive Sewer Project to Super Excavators which included 1-1/2" Bituminous overlay for Woods Road and included approval of an Alternate to install the surface course of asphalt in 1986, and WHEREAS, the Finance Committee has recommended that the 16, 1-1/2" Bituminous overlay (Woods Road only) in the amount contract with Super Excavators be amended to delete Item No. of $13,950.00, and the Alternate to install the surface course in 1986 in the amount of $1,125.00 for the Woods Road portion, and WHEREAS, Chapter 1.6.0 of the Standard Specifications for Sewer under the General Conditions of the contract, indicate that a and Water Construction in Wisconsin, as listed by reference contractor does not have to accept deductions which exceed 159. of the total cost of the project as bid, and this deduction is less than 159., and WHEREAS, the Finance Committee further recommended that the bidder for the 1986 Road Improvement Program, Payne & Dolan, at City have said surface course installed by the successful $22.30 per ton. NOW, THEREFORE, BE IT RESOLVED that the Common Council of the City of Muskego, upon recommendation of the Finance Committee, does hereby amend the contract with Super Excavators to delete Item No. 16, 1-1/2" Bituminous overlay (Woods Road only) in the amount of $13,950.00, and the Alternate to install the surface course in 1986 in the amount of $1,125.00 for the Woods Road port ion. BE IT FURTHER RESOLVED that Payne & Dolan are hereby authorized Ladwig Drive Sewer Project at $22.30 per ton. to install the Woods Road surface course in the area of the BE IT FURTHER RESOLVED that the Mayor and Clerk are hereby authorized to sign any necessary legal documents. 0 DATED THIS 22nd DAY OF