Loading...
CCR1977218RESOLUTION #218-77 APPROVAL OF PERMIT FOR THE APPLICATION OF WASTEWATER RESIDUE ON THE ALVIN BASSE PROPERTY WHEREAS, the City of Muskego has received a request for a permit for the application of wastewater residue on lands owned by Alvin Basse, and WHEREAS, the guidelines for procedures for the application of wastewater residue on agricultural lands established in Resolution #122-76 require Common Council approval, THEREFORE, BE IT RESOLVED that the Common Council of the City of Muskego does hereby approve of a permit for the Drum1 Company to apply wastewater residue on lands owned by Alvin Basse. BE IT FURTHER RESOLVED that the Common Council of the City of Muskego does hereby approve the guidelines as established in Resolution #122-76 and as proposed to be followed when the wastewater residue is applied to the Alvin Basse oroDertv. DATED THIS , 1977. PUBLIC WELFARE COWlvlITTEE &@T& Ald. Ralph R. Tomczykfl' ATTEST : CITY OF MUSKEG0 RECOMMENDED PROCEDURES FOR THE APPLICATION OF WASTEWATER RESIDUE The following procedures are recommended for the application of sewerage sludge to sites in the City of Muskego for the purpose of soil putrification 1. The contractor shall review the site as its suitability to all DNR requirements including, but not limited to the following: a) Drainage including adjacent water courses. b) Surface slopes of the site. c) Location of existing dwellings and location of public and private wells adjacent to the site. d) Soil suitability for uptake of sewerage~sludge includingxequired nutrification. e) Existence of high ground water or high bed rock. 2. The contractor shall provide the necessary information to DNR in order for the DNR to evaluate the site and determine the application rate for the site. 3. The contractor shall haul the sludge to the site in a closed tank truck and shall take the necessary measures to-prevent trucking of sludge and/or mud on public streets. 4. The contractor shall apply the sewerage sludge to the soil by one of the following methods: a) Hydraulically injecting the sludge into the soil. Injection pro- cedure should be contrclled in order to eliminate sludge on the surface. b) Surface spreading of the sludge on the soil. If surface spreading is used, the site must be turned over immediately after spreading. Note: ~imediately means that no sludge shall remain on the soil for more than one hour prior to turning the soil over. 5. Prior to the contractor applying the sludge to the site, the contractor shall provide the following information to the Building Inspection Dept. a) Name and address of contractor. b) Name and address of site owner. c) Location of site. d) Size of site. e) The date or dates the site will be used for sludge application. f) Method of sludge application. g) Application rate to be used and if this rate has been approved by Dh h) Confirm that the site has been approved by DNR giving name of DNR staff granting approval. 6. Permit will be limited to a one (1) year period. 7. There shall be a $25.00 minimum permit fee. 8. Each permit shall require Common Council approval.