Loading...
CCR1976005RESOLUTION #5-76 (As Amended) AUTHORIZING =FUND TO KENNETH LARSEN FOR CULVERT COST (S65 W13234 Longfellow Lane) WHEREAS, it is the City of Muskego's responsibili,ty to properly driveway culverts for new homes constructed i.n the City of Muskego, size and arrange for Brookfield Culvert Co. to provide and place and WHEREAS, Mr. Kenneth Larsen had contracted with Bielinski Builders to construct a new home on the northeast corner of Longfellow Lane and Saroyan Road facing Longfellow Lane, and WHEREAS, Bielinski Builders, on November 5, 1974, obtained a building permit and paid $380.00 for the culvert installed by the City of Muskego, and WHEREAS, construction of the basement was begun on November 21, 1974, includingekcavation, footings, basement walls, backfilling and delivery of framing materials, and WHEREAS, only after considerable construction was Mr. Larsen, and and the culvert had been placed for his driveway, and subsequently Bielinski Builders, notified that the city had erred WHEREAS, the culvert as originally sized amounted to a 30" pipe at a cost of $380.00, and WHEREAS, the resized culvert consisted of two 52" arched culverts at a cost of $1,300.00, said cul.verts to accommodate not only the normal drainage on Longfellow Lane but also the storm water carried through the main Fountainwood drainage ditch from New Berlin, and WHEREAS, the normal culvert as originally sized and placed at a cost of $380:00 would accommodate the normal dra.inage on Longfellow Lane, and WHEREAS, as the additional capacity of the resized two 52" arched culvert is required to handle the storm water from New Berlin through the Fountainwood Drainage ditch, THEREFORE, BE IT RESOLVED that the City of Muskego shall share the cost of the oversized culvert in amount of $650.00. DATED THIS @T DAY 0 a ATTEST: City Clerk 1/76 U je/p jk